Template:Migration barrier removal

From FIThydrowiki
Revision as of 20:07, 30 September 2020 by Maintenance script (talk | contribs) (Updating classification tables: minor changes)
Jump to navigation Jump to search
Classification Selection
Fish species for the measure All
Does the measure require loss of power production -
-
Juvenile habitat (0+)
Recurrence of maintenance Never
Which life-stage of fish is measure aimed at -
-
-
-
-
Movements of migration of fish
Which physical parameter is addressed -
-
Flow variations
Substrate and hyporheic zone
Water temperature
Ice
Water velocity
Water depth
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for Up to 20
Section in the regulated system measure is designed for In dam/power plant
-
-
-
River type implemented -
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
Slow flowing, lowland, sandy (less than 0.05 %)
Level of certainty in effect Moderately certain
Technology readiness level TRL 8: system complete and qualified
Cost of solution See cost table