Template:Sediment sluicing
Revision as of 12:21, 2 July 2020 by Maintenance script (talk | contribs) (Updating classification tables: minor changes)
Classification | Selection |
---|---|
Fish species for the measure | Eel and Lamprey |
Does the measure require loss of power production | Operational (requires flow release outside turbine) |
- | |
- | |
Recurrence of maintenance | Irregular at events |
Which life-stage of fish is measure aimed at | Spawning / Recruitment |
Juvenile habitat (0+) | |
Juvenile habitat (1+) | |
Juvenile habitat (older than 1+) | |
Adult fish | |
Movements of migration of fish | |
Which physical parameter is addressed | - |
- | |
- | |
Substrate and hyporheic zone | |
- | |
- | |
- | |
- | |
Hydropower type the measure is suitable for | Plant in dam |
Plant with bypass section | |
Dam height (m) the measure is suitable for | Higher than 10 |
Section in the regulated system measure is designed for | - |
- | |
Bypass section | |
Downstream outlet | |
River type implemented | Bypass section |
- | |
- | |
Level of certainty in effect | Moderately certain |
Technology readiness level | TRL 9: actual system proven in operational environment |