Template:Cleaning of substrate – ripping, ploughing and flushing

From FIThydrowiki
Revision as of 12:13, 2 July 2020 by Maintenance script (talk | contribs) (Updating classification tables: minor changes)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Classification Selection
Fish species for the measure Gravel spawners
Does the measure require loss of power production -
-
Structural (requires no additional flow release)
Recurrence of maintenance Less often than yearly
Which life-stage of fish is measure aimed at Spawning / Recruitment
Juvenile habitat (0+)
Juvenile habitat (1+)
Juvenile habitat (older than 1+)
-
-
Which physical parameter is mitigated -
-
-
Substrate and hyporheic zone
-
-
-
-
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for -
Upstream of hydropower plant
Bypass section
Downstream outlet
River type implemented Bypass section
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
-
Level of certainty in effect Very certain
Technology readiness level TRL 9: actual system proven in operational environment