Template:Operational measures (turbine operations, spillway passage)
Revision as of 14:58, 13 January 2020 by Maintenance script (talk | contribs) (Updating classification tables: changing available parameters)
Classification | Selection |
---|---|
Fish species for the measure | All |
Does the measure require loss of power production | Operational (requires flow release outside turbine) |
- | |
- | |
Recurrence of maintenance | Irregular at events |
Which life-stage of fish is measure aimed at | - |
- | |
- | |
Movements and migration of fish | |
Which physical parameter is mitigated | N/A |
Barriers | |
- | |
- | |
- | |
- | |
- | |
- | |
- | |
Hydropower type the measure is suitable for | Plant in dam |
Plant with bypass section | |
Dam height (m) the measure is suitable for | All |
Section in the regulated system measure is designed for | In dam/power plant |
- | |
Bypass section | |
Downstream outlet | |
River type implemented | Steep gradient (up to 0.4 %) |
Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
Slow flowing, lowland, sandy (less than 0.05 %) | |
Level of certainty in effect | Moderately certain |
Technology readiness level | TRL 9: actual system proven in operational environment |