Template:Classification migration barrier removal
Revision as of 12:11, 25 October 2019 by Bendikhansen (talk | contribs) (Created page with "{| class="wikitable" ! Classification !! Selection |- |Fish species for the measure||Fish species for the measure::All |- |rowspan = "3"|Does the measure require loss of p...")
Classification | Selection |
---|---|
Fish species for the measure | All |
Does the measure require loss of power production | - |
- | |
Structural (requires no additional flow release) | |
Recurrence of maintenance | Irregular at events |
Which life-stage of fish is measure aimed at | - |
- | |
- | |
- | |
- | |
Movements of migration of fish | |
Which physical parameter is mitigated | N/A |
- | |
- | |
- | |
- | |
- | |
- | |
- | |
Hydropower type the measure is suitable for | Plant in dam |
Plant with bypass section | |
Dam height (m) the measure is suitable for | All |
Section in the regulated system measure is designed for | In dam/power plant |
- | |
- | |
- | |
River type implemented | - |
Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
Slow flowing, lowland, sandy (less than 0.05 %) | |
Level of certainty in effect | Very uncertain |
Technology readiness level | TRL 7: system prototype demonstration in operational environment |