Pool-type fishways

From FIThydrowiki
Revision as of 12:30, 23 June 2019 by Bendikhansen (talk | contribs)
Jump to navigation Jump to search

Introduction

Figure 1: Pool-type fishway for salmon and trout in Norway (Photo: Hans-Petter Fjeldstad).

Pool-type fishways is today the most common fish passage type in Europe (Silva et al. 2017, Fjeldstad 2012). It consists of pools separated by transverse walls with surface notches or submerged orifices. In addition, vertical slots all the way from the surface to the bottom can be used between the pools This fish passage type is suited for strong swimmers, such as adult salmon and trout, while it often has reduced functionality for other species of fishes and juvenile fish. Benthos usually cannot pass through pool type fishways. Bottom cuts that improve conditions for these species tend to quickly be clogged (DWA 2014) and are usually not suitable for eels and lamprey (Armstrong et al., 2010). Pool type fishways requires stable water discharge to work. One exception is the vertical slot type, which is more flexible for upstream water level and discharge. Adjustable sluice gates can provide stable water flow at varying upstream water levels. This fishway type may be suitable for adult salmon and large trout even when the available terrain is steep.

It is recommended that the pools are at least 1.5 m long for trout and 2.8 m long for salmon (Seifert 2014, DWA 2014), preferably larger. Energy density should be below 200 W/m3. For leap level, max. 50 cm for salmon and trout is recommended. Exceptionally, up to 75 cm can work for adult salmon and sea trout in steep rivers, but then the pool depth should be at least 1.5 m. For resident trout and for grayling, maximum drop between pools should be 20 cm, and for carp fishes 10-15 cm. Ideally, however, one should make vertical slot fishways for these species. The slots should be deeper than the drop height between pools, so that the fish can mainly swim between the pools and are not forced to jump (DWA 2014). For salmon and large trout, the fishway gradient should be between 0.1 and 0.2. For resident trout and carp fish, it should be below 0.1. Coarse or rough bottom substrates in the pools will facilitate migration, but this must always be balanced against reduced volume and water depth.

Methods, tools, and devices

During planning

Planning of a pool-type fishway will start with mapping and surveying of the barrier itself and the river reach upstream and downstream of the barrier, including information about the hydropower scheme. Surveying must also be conducted in the area of the river bank where the fishway is planned, including geological surveying. Geographic data should be handled in GIS software for further planning and analyses. The design of the fishway should be conducted with conventional hydraulic- and civil engineering calculations and drawing. All material used in a fishway must be planned to withstand physical strain from water, floods and frost. Monitoring facilities should basically be planned in the upper part of the fishway.

During implementation

Physical implementation of pool-type fishways requires heavy machinery suited for the river size and its surrounding terrain, such as excavators and lorries. Work with explosives is relevant in most cases and blasted rocks and transportation of material out from the site is common. Surplus rocks should not be disposed at site because of pollution risk. The construction phase includes construction of concrete formwork, casting of concrete and iron reinforcement work. In certain sites, pools are formed in clean rocks.

During operation

Injuries on pool-type fishways from physical wear must be monitored and repaired in order to secure regular fish migration. Maintenance work normally require hand-tools more than heavy equipment, but casting of concrete is typical. Depending of the site, removal of sediment, branches, logs and floating debris in pools and fishway entrance is common. Monitoring systems require regular inspection, depending on product and system.

Classification table

Classification

 

Selection (multiple)

Fish species measure designed for

All, but to the largest extent the stronger swimmers

Does the measure require loss of power production?

Operational (requires flow release outside turbine)

 

Recurrence of maintenance

Irregular at events

Which life-stage of fish is measure aimed at?

Upstream movement and migration

Adult fish

Which physical parameter mitigated?

All

Hydropower type the measure is suitable for

Plant in dam

Plant with bypass section

Dam height [m] the measure is suitable for

0-50 meter

Section in the regulated system measure is designed for

Bypass section

 

River type implemented

All

Level of certainty in effect

Moderately certain

 

Technology readiness level

TRL 8

TRL 9

 

operational environment

system complete and qualified actual system proven in operational environment