This is the full list of potential inputs to the classification tables used for the various mitigation measures
Full list of classification table answers | |
---|---|
Classification | Selection (multiple) |
Fish species for the measure | Single or groups of fish species in Europe |
Does the measure require loss of power production | Operational (requires flow release outside turbine) |
Operational (requires flow release through turbine) | |
Structural (requires no additional flow release) | |
Recurrence of maintenance | Never |
Daily | |
Weekly | |
Yearly | |
Less often than yearly | |
Irregular at events | |
Which life-stage of fish is measure aimed at | Spawning / Recruitment |
Juveniles | |
Adult fish | |
Movements and migration of fish | |
Which physical parameter is addressed | Barriers |
Flow quantity | |
Flow variations | |
Substrate and hyporheic zone | |
Water temperature | |
Ice | |
Water velocity | |
Water depth | |
Hydropower type the measure is suitable for | Plant in dam |
Plant with bypass section | |
Dam height (m) the measure is suitable for | Up to 10 |
Up to 20 | |
Up to 50 | |
Higher than 10 | |
All | |
Section in the regulated system measure is designed for | In dam/power plant |
Upstream of hydropower plant | |
Bypass section | |
Downstream outlet | |
River type implemented | Steep gradient (up to 0.4 %) |
Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
Slow flowing, lowland, sandy (less than 0.05 %) | |
Level of certainty in effect | Very certain |
Moderately certain | |
Uncertain | |
Very uncertain | |
Technology readiness level | TRL 1: basic principles observed |
TRL 2: technology concept formulated | |
TRL 3: experimental proof of concept | |
TRL 4: technology validated in lab | |
TRL 5: technology validated in relevant environment) | |
TRL 6: technology demonstrated in relevant environment) | |
TRL 7: system prototype demonstration in operational environment | |
TRL 8: system complete and qualified | |
TRL 9: actual system proven in operational environment |
Classification | Selection (multiple) |
---|---|
Fish species for the measure | Single or groups of fish species in Europe |
Does the measure require loss of power production | Operational (requires flow release outside turbine) |
Operational (requires flow release through turbine) | |
Structural (requires no additional flow release) | |
Recurrence of maintenance | Never |
Daily | |
Weekly | |
Yearly | |
Less often than yearly | |
Irregular at events | |
Which life-stage of fish is measure aimed at | Spawning / Recruitment |
Juvenile habitat (0+) | |
Juvenile habitat (1+) | |
Juvenile habitat (older than 1+) | |
Adult fish | |
Movements of migration of fish | |
Which physical parameter is mitigated | N/A |
Flow quantity | |
Flow variations | |
Substrate and hyporheic zone | |
Water temperature | |
Ice | |
Water velocity | |
Water depth | |
Hydropower type the measure is suitable for | Plant in dam |
Plant with bypass section | |
Dam height (m) the measure is suitable for | Categories in (m) |
Section in the regulated system measure is designed for | In dam/power plant |
Upstream power plant | |
Bypass section | |
Downstream outlet | |
River type implemented | Steep gradient (up to 0.4 %) |
Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
Slow flowing, lowland, sandy (less than 0.05 %) | |
Level of certainty in effect | Very certain |
Moderately certain | |
Uncertain | |
Very uncertain | |
Technology readiness level | TRL 1: basic principles observed |
TRL 2: technology concept formulated | |
TRL 3: experimental proof of concept | |
TRL 4: technology validated in lab | |
TRL 5: technology validated in relevant environment) | |
TRL 6: technology demonstrated in relevant environment) | |
TRL 7: system prototype demonstration in operational environment | |
TRL 8: system complete and qualified | |