Template:Tester
Revision as of 12:11, 14 October 2019 by Bendikhansen (talk | contribs)
Classification | Selection (multiple) |
---|---|
Fish species for the measure | All All |
Does the measure require loss of power production | Operational (requires flow release outside turbine) Operational (requires flow release outside turbine) |
Operational (requires flow release through turbine) Operational (requires flow release through turbine) | |
Recurrence of maintenance | Never Never |
Which life-stage of fish is measure aimed at | Spawning / Recruitment Spawning / Recruitment |
Juvenile habitat (0+) Juvenile habitat (0+) | |
Juvenile habitat (1+) Juvenile habitat (1+) | |
Juvenile habitat (older than 1+) Juvenile habitat (older than 1+) | |
Adult fish Adult fish | |
Movements of migration of fish Movements of migration of fish | |
Which physical parameter is mitigated | |
Water velocity | |
Water depth | |
Hydropower type the measure is suitable for | Plant in dam Plant in dam |
Plant with bypass section Plant with bypass section | |
Dam height (m) the measure is suitable for | All All |
Section in the regulated system measure is designed for | |
Bypass section Bypass section | |
Downstream outlet Downstream outlet | |
River type implemented | Steep gradient (up to 0.4 %) Steep gradient (up to 0.4 %) |
Fairly steep with rocks, boulders (from 0.4 to 0.05 %) Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
Slow flowing, lowland, sandy (less than 0.05 %) Slow flowing, lowland, sandy (less than 0.05 %) | |
Level of certainty in effect | Very certain Very certain |
Technology readiness level | TRL 9: actual system proven in operational environment TRL 9: actual system proven in operational environment |