Template:Tester

From FIThydrowiki
Revision as of 11:51, 14 October 2019 by Bendikhansen (talk | contribs)
Jump to navigation Jump to search
Classification Mitigating reduced annual flow and low flow measures
Fish species for the measure All All


Does the measure require loss of power production? Operational (requires flow release outside turbine)
Operational (requires flow release through turbine)
Which life-stage of fish is measure aimed at? Spawning / Recruitment
Juvenile habitat (0+)
Juvenile habitat (1+)
Juvenile habitat (older than 1+)
Adult fish
Movements of migration of fish
Which physical parameter is mitigated?
Water velocity
Water depth
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height [m] the measure is suitable for All
Section in the regulated system measure is designed for
Bypass section
Downstream outlet
River type implemented Steep gradient (> 0.4 %)
Fairly steep with rocks, boulders (< 0.4; > 0.05 %)
Slow flowing, lowland, sandy (< 0.05 %)
Level of certainty in effect Very certain
Technology readiness level TRL 9: actual system proven in operational environment