Fish Protection System (induced drift application)
Revision as of 13:52, 23 September 2020 by Bendikhansen (talk | contribs)
This technology has been enhanced in the FIThydro project! See Innovative technologies from FIThydro for a complete list.
Contents
Introduction
Methods, tools, and devices
During planning
During implementation
During operation
Relevant MTDs and test cases
Relevant measures | |
---|---|
N/A | |
Relevant test cases | Applied in test case? |
Altheim test case | - |
Altusried test case | - |
Anundsjö test case | - |
Bannwil test case | - |
Bragado test case | - |
Gotein test case | - |
Guma and Vadocondes test cases | - |
Günz test case | - |
Ham test case | - |
Las Rives test case | - |
Schiffmühle test case | - |
Trois Villes test case | - |
Classification table
- N/A
- N/A
- N/A
Classification | Selection |
---|---|
Fish species for the measure | 0 |
Does the measure require loss of power production | - |
- | |
- | |
Which life-stage of fish is measure aimed at | - |
- | |
- | |
- | |
- | |
- | |
Which physical parameter is addressed | - |
- | |
- | |
- | |
- | |
- | |
- | |
- | |
Hydropower type the measure is suitable for | - |
- | |
Section in the regulated system measure is designed for | - |
- | |
- | |
- | |
River type implemented | - |
- | |
- | |
Technology readiness level | TRL 8: system complete and qualified |
Cost of solution | See cost table |