This is the full list of potential inputs to the classification tables used for the various mitigation measures
Classification | Selection (multiple) | |
---|---|---|
Fish species for the measure | Single or groups of fish species in Europe | |
Does the measure require loss of power
production |
Operational (requires flow release outside turbine) | |
Operational (requires flow release through turbine) | ||
Structural (requires no additional flow release) | ||
Recurrence of maintenance | Never | |
Daily | ||
Weekly | ||
Yearly | ||
Less often than yearly | ||
Irregular at events | ||
Which life-stage of fish is measure aimed at | Spawning / Recruitment | |
Juveniles | ||
Adult fish | ||
Movements and migration of fish | ||
Which physical parameter is addressed | Barriers | |
Flow quantity | ||
Flow variations | ||
Substrate and hyporheic zone | ||
Water temperature | ||
Ice | ||
Water velocity | ||
Water depth | ||
Hydropower type the measure is suitable for | Plant in dam | |
Plant with bypass section | ||
Dam height (m) the measure is suitable for | Up to 10 | |
Up to 20 | ||
Up to 50 | ||
Higher than 10 | ||
All | ||
Section in the regulated system measure is designed for | In dam/power plant | |
Upstream of hydropower plant | ||
Bypass section | ||
Downstream outlet | ||
River type implemented | Steep gradient (up to 0.4 %) | |
Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | ||
Slow flowing, lowland, sandy (less than 0.05 %) | ||
Level of certainty in effect | Very certain | |
Moderately certain | ||
Uncertain | ||
Very uncertain | ||
Technology readiness level | TRL 1: basic principles observed | |
TRL 2: technology concept formulated | ||
TRL 3: experimental proof of concept | ||
TRL 4: technology validated in lab | ||
TRL 5: technology validated in relevant environment) | ||
TRL 6: technology demonstrated in relevant environment) | ||
TRL 7: system prototype demonstration in operational environment | ||
TRL 8: system complete and qualified | ||
TRL 9: actual system proven in operational environment |
Classification | Selection (multiple) |
---|---|
Fish species for the measure | Single or groups of fish species in Europe |
Does the measure require loss of power production | Operational (requires flow release outside turbine) |
Operational (requires flow release through turbine) | |
Structural (requires no additional flow release) | |
Recurrence of maintenance | Never |
Daily | |
Weekly | |
Yearly | |
Less often than yearly | |
Irregular at events | |
Which life-stage of fish is measure aimed at | Spawning / Recruitment |
Juvenile habitat (0+) | |
Juvenile habitat (1+) | |
Juvenile habitat (older than 1+) | |
Adult fish | |
Movements of migration of fish | |
Which physical parameter is mitigated | N/A |
Flow quantity | |
Flow variations | |
Substrate and hyporheic zone | |
Water temperature | |
Ice | |
Water velocity | |
Water depth | |
Hydropower type the measure is suitable for | Plant in dam |
Plant with bypass section | |
Dam height (m) the measure is suitable for | Categories in (m) |
Section in the regulated system measure is designed for | In dam/power plant |
Upstream power plant | |
Bypass section | |
Downstream outlet | |
River type implemented | Steep gradient (up to 0.4 %) |
Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
Slow flowing, lowland, sandy (less than 0.05 %) | |
Level of certainty in effect | Very certain |
Moderately certain | |
Uncertain | |
Very uncertain | |
Technology readiness level | TRL 1: basic principles observed |
TRL 2: technology concept formulated | |
TRL 3: experimental proof of concept | |
TRL 4: technology validated in lab | |
TRL 5: technology validated in relevant environment) | |
TRL 6: technology demonstrated in relevant environment) | |
TRL 7: system prototype demonstration in operational environment | |
TRL 8: system complete and qualified | |
TRL 9: actual system proven in operational environment |