Difference between revisions of "Template:Minimizing sediment arrival to reservoir"
Jump to navigation
Jump to search
(Updating classification tables: minor changes) |
(Updating classification tables: minor changes) |
||
Line 4: | Line 4: | ||
|Fish species for the measure||[[Fish species for the measure::All]] | |Fish species for the measure||[[Fish species for the measure::All]] | ||
|- | |- | ||
− | |rowspan = "3"|Does the measure require loss of power production|| | + | |rowspan = "3"|Does the measure require loss of power production||[[Does the measure require loss of power production::Operational (requires flow release outside turbine)]] |
|- | |- | ||
||- | ||- | ||
|- | |- | ||
− | || | + | ||- |
|- | |- | ||
||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]] | ||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]] | ||
|- | |- | ||
− | |rowspan = " | + | |rowspan = "4"|Which life-stage of fish is measure aimed at||[[Which life-stage of fish is measure aimed at::Spawning / Recruitment]] |
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | ||[[Which life-stage of fish is measure aimed at:: | + | ||[[Which life-stage of fish is measure aimed at::Juveniles]] |
|- | |- | ||
||[[Which life-stage of fish is measure aimed at::Adult fish]] | ||[[Which life-stage of fish is measure aimed at::Adult fish]] | ||
Line 24: | Line 20: | ||
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]] | ||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]] | ||
|- | |- | ||
− | |rowspan = "8"|Which physical parameter is addressed||- | + | |rowspan="8"|Which physical parameter is addressed||- |
|- | |- | ||
||- | ||- | ||
Line 40: | Line 36: | ||
||- | ||- | ||
|- | |- | ||
− | |rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]] | + | |rowspan="2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]] |
|- | |- | ||
||[[Hydropower type the measure is suitable for::Plant with bypass section]] | ||[[Hydropower type the measure is suitable for::Plant with bypass section]] | ||
|- | |- | ||
− | ||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]] | + | |rowspan = "1"|Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]] |
|- | |- | ||
− | |rowspan = "4"|Section in the regulated system measure is designed for||- | + | |rowspan="4"|Section in the regulated system measure is designed for||- |
|- | |- | ||
||[[Section in the regulated system measure is designed for::Upstream of hydropower plant]] | ||[[Section in the regulated system measure is designed for::Upstream of hydropower plant]] | ||
Line 54: | Line 50: | ||
||[[Section in the regulated system measure is designed for::Downstream outlet]] | ||[[Section in the regulated system measure is designed for::Downstream outlet]] | ||
|- | |- | ||
− | |rowspan = "3"|River type implemented||[[ | + | |rowspan = "3"|River type implemented||[[River type implemented::Steep gradient (up to 0.4 %)]] |
|- | |- | ||
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]] | ||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]] | ||
Line 62: | Line 58: | ||
||Level of certainty in effect||[[Level of certainty in effect::Very certain]] | ||Level of certainty in effect||[[Level of certainty in effect::Very certain]] | ||
|- | |- | ||
− | ||Technology readiness level||[[Technology readiness level::TRL | + | ||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]] |
|- | |- | ||
||Cost of solution||See [[Costs of solutions|cost table]] | ||Cost of solution||See [[Costs of solutions|cost table]] | ||
|} | |} |
Latest revision as of 13:48, 9 October 2020
Classification | Selection |
---|---|
Fish species for the measure | All |
Does the measure require loss of power production | Operational (requires flow release outside turbine) |
- | |
- | |
Recurrence of maintenance | Irregular at events |
Which life-stage of fish is measure aimed at | Spawning / Recruitment |
Juveniles | |
Adult fish | |
Movements of migration of fish | |
Which physical parameter is addressed | - |
- | |
- | |
Substrate and hyporheic zone | |
- | |
- | |
- | |
- | |
Hydropower type the measure is suitable for | Plant in dam |
Plant with bypass section | |
Dam height (m) the measure is suitable for | All |
Section in the regulated system measure is designed for | - |
Upstream of hydropower plant | |
Bypass section | |
Downstream outlet | |
River type implemented | Steep gradient (up to 0.4 %) |
Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
Slow flowing, lowland, sandy (less than 0.05 %) | |
Level of certainty in effect | Very certain |
Technology readiness level | TRL 9: actual system proven in operational environment |
Cost of solution | See cost table |