Difference between revisions of "Template:Removal of bank protection"

From FIThydrowiki
Jump to navigation Jump to search
(Updating classification tables: minor changes)
(Updating classification tables: minor changes)
 
Line 2: Line 2:
 
! Classification !! Selection
 
! Classification !! Selection
 
|-
 
|-
|Fish species for the measure||[[Fish species for the measure::All]]
+
|Fish species for the measure||[[Fish species for the measure::0]]
 
|-
 
|-
|rowspan = "3"|Does the measure require loss of power production||[[Does the measure require loss of power production::Operational (requires flow release outside turbine)]]
+
|rowspan = "3"|Does the measure require loss of power production||-
 
|-
 
|-
 
||-
 
||-
Line 10: Line 10:
 
||-
 
||-
 
|-
 
|-
||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]]
+
#N/A
 
|-
 
|-
 
|rowspan = "6"|Which life-stage of fish is measure aimed at||-
 
|rowspan = "6"|Which life-stage of fish is measure aimed at||-
Line 20: Line 20:
 
||-
 
||-
 
|-
 
|-
||[[Which life-stage of fish is measure aimed at::Adult fish]]
+
||-
 
|-
 
|-
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]]
+
||-
 
|-
 
|-
|rowspan = "8"|Which physical parameter is addressed||[[Which physical parameter is addressed::N/A]]
+
|rowspan = "8"|Which physical parameter is addressed||-
 
|-
 
|-
 
||-
 
||-
Line 40: Line 40:
 
||-
 
||-
 
|-
 
|-
|rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
+
|rowspan = "2"|Hydropower type the measure is suitable for||-
 
|-
 
|-
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
+
||-
 
|-
 
|-
||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::Up to 20]]
+
#N/A
 
|-
 
|-
|rowspan = "4"|Section in the regulated system measure is designed for||[[Section in the regulated system measure is designed for::In dam/power plant]]
+
|rowspan = "4"|Section in the regulated system measure is designed for||-
 
|-
 
|-
 
||-
 
||-
Line 56: Line 56:
 
|rowspan = "3"|River type implemented||-
 
|rowspan = "3"|River type implemented||-
 
|-
 
|-
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]
+
||-
 +
|-
 +
||-
 
|-
 
|-
||[[River type implemented::Slow flowing, lowland, sandy (less than 0.05 %)]]
+
#N/A
 
|-
 
|-
||Level of certainty in effect||[[Level of certainty in effect::Moderately certain]]
+
||Technology readiness level||[[Technology readiness level::TRL 8: system complete and qualified]]
 
|-
 
|-
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]]
+
||Cost of solution||See [[Costs of solutions|cost table]]
 
|}
 
|}

Latest revision as of 12:53, 30 September 2020

  1. N/A
  1. N/A
  1. N/A
Classification Selection
Fish species for the measure 0
Does the measure require loss of power production -
-
-
Which life-stage of fish is measure aimed at -
-
-
-
-
-
Which physical parameter is addressed -
-
-
-
-
-
-
-
Hydropower type the measure is suitable for -
-
Section in the regulated system measure is designed for -
-
-
-
River type implemented -
-
-
Technology readiness level TRL 8: system complete and qualified
Cost of solution See cost table