Difference between revisions of "Costs of solutions"
Jump to navigation
Jump to search
Bendikhansen (talk | contribs) |
Bendikhansen (talk | contribs) |
||
Line 35: | Line 35: | ||
| style="vertical-align:bottom; text-align:left;" | per meter | | style="vertical-align:bottom; text-align:left;" | per meter | ||
|- style="vertical-align:middle;" | |- style="vertical-align:middle;" | ||
− | | rowspan="3" | | + | | rowspan="3" | Restoring habitat |
| style="text-align:left;" | [[Removal of weirs]] | | style="text-align:left;" | [[Removal of weirs]] | ||
| 2,000 | | 2,000 | ||
Line 51: | Line 51: | ||
| style="vertical-align:bottom; text-align:left;" | per square meter | | style="vertical-align:bottom; text-align:left;" | per square meter | ||
|- style="vertical-align:middle;" | |- style="vertical-align:middle;" | ||
− | | rowspan="2" | | + | | rowspan="2" | Shoreline habitat |
| style="text-align:left;" | [[Environmental design of embankments and erosion protection]] | | style="text-align:left;" | [[Environmental design of embankments and erosion protection]] | ||
| 10 | | 10 | ||
Line 154: | Line 154: | ||
|- style="vertical-align:middle;" | |- style="vertical-align:middle;" | ||
| rowspan="8" | Sediment | | rowspan="8" | Sediment | ||
− | | rowspan="2" | | + | | rowspan="2" | Routing |
| style="text-align:left;" | [[Drawdown reservoir flushing]] | | style="text-align:left;" | [[Drawdown reservoir flushing]] | ||
| 1 | | 1 |
Revision as of 09:02, 5 August 2020
Note: the info on this page is temporary, for demonstration purposes File:Broken
One of the goals of the FIThydro project is to determine the financial costs of implementing mitigation measures (solutions).