Difference between revisions of "Fish guidance structures with narrow bar spacing"
Jump to navigation
Jump to search
Bendikhansen (talk | contribs) |
Bendikhansen (talk | contribs) |
||
Line 19: | Line 19: | ||
=Relevant literature= | =Relevant literature= | ||
− | [[category:Downstream fish migration measures]][[category:Measures]] | + | [[category:Downstream fish migration measures]][[category:Measures]][[Category:Enhanced in FIThydro]] |
Revision as of 13:58, 6 July 2020
This technology has been enhanced in the FIThydro project! See Innovative technologies from FIThydro for a complete list.
Contents
Introduction
Methods, tools, and devices
During planning
During implementation
During operation
Relevant MTDs and test cases
Classification table
Classification | Selection |
---|---|
Fish species for the measure | All |
Does the measure require loss of power production | Operational (requires flow release outside turbine) |
- | |
- | |
Recurrence of maintenance | Yearly |
Which life-stage of fish is measure aimed at | - |
- | |
- | |
Movements of migration of fish | |
Which physical parameter is addressed | N/A |
- | |
- | |
- | |
- | |
- | |
- | |
- | |
Hydropower type the measure is suitable for | Plant in dam |
Plant with bypass section | |
Dam height (m) the measure is suitable for | Up to 10 |
Section in the regulated system measure is designed for | In dam/power plant |
- | |
- | |
- | |
River type implemented | Steep gradient (up to 0.4 %) |
Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
Slow flowing, lowland, sandy (less than 0.05 %) | |
Level of certainty in effect | Very certain |
Technology readiness level | TRL 9: actual system proven in operational environment |
Cost of solution | See cost table |