Line 24: Line 24:
 
||-
 
||-
 
|-
 
|-
|rowspan = "8"|Which physical parameter is mitigated||-
+
|rowspan = "8"|Which physical parameter is addressed||-
 
|-
 
|-
 
||-
 
||-
Line 30: Line 30:
 
||-
 
||-
 
|-
 
|-
||[[Which physical parameter is mitigated::Substrate and hyporheic zone]]
+
||[[Which physical parameter is addressed::Substrate and hyporheic zone]]
 
|-
 
|-
 
||-
 
||-

Revision as of 12:21, 2 July 2020

Classification Selection
Fish species for the measure 0
Does the measure require loss of power production -
-
Structural (requires no additional flow release)
Recurrence of maintenance Less often than yearly
Which life-stage of fish is measure aimed at Spawning / Recruitment
-
-
-
-
-
Which physical parameter is addressed -
-
-
Substrate and hyporheic zone
-
-
-
-
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for -
Upstream of hydropower plant
Bypass section
Downstream outlet
River type implemented Bypass section
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
-
Level of certainty in effect Very certain
Technology readiness level TRL 9: actual system proven in operational environment