Difference between revisions of "Template:Off-channel reservoir storage"

From FIThydrowiki
Jump to navigation Jump to search
(Updating classification tables: minor changes)
(Updating classification tables: minor changes)
Line 24: Line 24:
 
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]]
 
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]]
 
|-
 
|-
|rowspan = "8"|Which physical parameter is mitigated||-
+
|rowspan = "8"|Which physical parameter is addressed||-
 
|-
 
|-
 
||-
 
||-
Line 30: Line 30:
 
||-
 
||-
 
|-
 
|-
||[[Which physical parameter is mitigated::Substrate and hyporheic zone]]
+
||[[Which physical parameter is addressed::Substrate and hyporheic zone]]
 
|-
 
|-
 
||-
 
||-

Revision as of 12:21, 2 July 2020

Classification Selection
Fish species for the measure All
Does the measure require loss of power production Operational (requires flow release outside turbine)
-
-
Recurrence of maintenance Irregular at events
Which life-stage of fish is measure aimed at Spawning / Recruitment
Juvenile habitat (0+)
Juvenile habitat (1+)
Juvenile habitat (older than 1+)
Adult fish
Movements of migration of fish
Which physical parameter is addressed -
-
-
Substrate and hyporheic zone
-
-
-
-
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for Higher than 10
Section in the regulated system measure is designed for -
-
Bypass section
Downstream outlet
River type implemented Bypass section
-
-
Level of certainty in effect Moderately certain
Technology readiness level TRL 9: actual system proven in operational environment