{| class="wikitable"
+
 
! colspan="2" style="text-align: center; background-color:#2cb4da; color:#ffffff;" |Truck transport
 
|-
 
! Classification !! Selection
 
|-
 
|Fish species for the measure||[[Fish species for the measure::All]]
 
|-
 
|rowspan = "3"|Does the measure require loss of power production||-
 
|-
 
||-
 
|-
 
||[[Does the measure require loss of power production::Structural (requires no additional flow release)]]
 
|-
 
||Recurrence of maintenance||[[Recurrence of maintenance::Never]]
 
|-
 
|rowspan = "4"|Which life-stage of fish is measure aimed at||-
 
|-
 
||-
 
|-
 
||-
 
|-
 
||[[Which life-stage of fish is measure aimed at::Movements and migration of fish]]
 
|-
 
|rowspan = "8"|Which physical parameter is addressed||[[Which physical parameter is addressed::Barriers]]
 
|-
 
||-
 
|-
 
||-
 
|-
 
||-
 
|-
 
||-
 
|-
 
||-
 
|-
 
||-
 
|-
 
||-
 
|-
 
|rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
 
|-
 
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
 
|-
 
||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]]
 
|-
 
|rowspan = "4"|Section in the regulated system measure is designed for||[[Section in the regulated system measure is designed for::In dam/power plant]]
 
|-
 
||-
 
|-
 
||-
 
|-
 
||-
 
|-
 
|rowspan = "3"|River type implemented||[[River type implemented::Steep gradient (up to 0.4 %)]]
 
|-
 
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]
 
|-
 
||[[River type implemented::Slow flowing, lowland, sandy (less than 0.05 %)]]
 
|-
 
||Level of certainty in effect||[[Level of certainty in effect::Moderately certain]]
 
|-
 
||Technology readiness level||[[Technology readiness level::TRL 8: system complete and qualified]]
 
|}
 