Difference between revisions of "Classification table"

From FIThydrowiki
Jump to navigation Jump to search
Line 76: Line 76:
 
|-
 
|-
 
| Upstream of hydropower plant
 
| Upstream of hydropower plant
|-
 
| Bypass section
 
|-
 
| Downstream outlet
 
|-
 
| rowspan="3" | River type implemented
 
| Steep gradient (up to 0.4 %)
 
|-
 
| Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
 
|-
 
| Slow flowing, lowland, sandy (less than 0.05 %)
 
|-
 
| rowspan="4" | Level of certainty in effect
 
| Very certain
 
|-
 
| Moderately certain
 
|-
 
| Uncertain
 
|-
 
| Very uncertain
 
|-
 
| rowspan="9" | Technology readiness level
 
| TRL 1: basic principles observed
 
|-
 
| TRL 2: technology concept formulated
 
|-
 
| TRL 3: experimental proof of concept
 
|-
 
| TRL 4: technology validated in lab
 
|-
 
| TRL 5: technology validated in relevant environment)
 
|-
 
| TRL 6: technology demonstrated in relevant environment)
 
|-
 
| TRL 7: system prototype demonstration in operational environment
 
|-
 
| TRL 8: system complete and qualified
 
|-
 
| TRL 9: actual system proven in operational environment
 
|}
 
 
 
{| class="wikitable"
 
! Classification
 
! Selection (multiple)
 
|-
 
| Fish species for the measure
 
| Single or groups of fish species in Europe
 
|-
 
| rowspan="3" | Does the measure require loss of power production
 
| Operational (requires flow release outside turbine)
 
|-
 
| Operational (requires flow release through turbine)
 
|-
 
| Structural (requires no  additional flow release)
 
|-
 
| rowspan="6" | Recurrence of maintenance
 
| Never
 
|-
 
| Daily
 
|-
 
| Weekly
 
|-
 
| Yearly
 
|-
 
| Less often than yearly
 
|-
 
| Irregular at events
 
|-
 
| rowspan="6" | Which life-stage of fish is measure aimed at
 
| Spawning / Recruitment
 
|-
 
| Juvenile habitat (0+)
 
|-
 
| Juvenile habitat (1+)
 
|-
 
| Juvenile habitat (older than 1+)
 
|-
 
| Adult fish
 
|-
 
| Movements of migration of fish
 
|-
 
| rowspan="8" | Which physical parameter is mitigated
 
| N/A
 
|-
 
| Flow quantity
 
|-
 
| Flow variations
 
|-
 
| Substrate and hyporheic zone
 
|-
 
| Water temperature
 
|-
 
| Ice
 
|-
 
| Water velocity
 
|-
 
| Water depth
 
|-
 
| rowspan="2" | Hydropower type the measure is suitable for
 
| Plant in dam
 
|-
 
| Plant with bypass section
 
|-
 
|| Dam height (m) the measure is suitable for
 
| Categories in (m)
 
|-
 
| rowspan="4" | Section in the regulated system measure is designed for
 
| In dam/power plant
 
|-
 
| Upstream power plant
 
 
|-
 
|-
 
| Bypass section
 
| Bypass section

Revision as of 15:12, 28 January 2020

This is the full list of potential inputs to the classification tables used for the various mitigation measures

Full list of classification table answers
Classification Selection (multiple)
Fish species for the measure Single or groups of fish species in Europe
Does the measure require loss of power production Operational (requires flow release outside turbine)
Operational (requires flow release through turbine)
Structural (requires no additional flow release)
Recurrence of maintenance Never
Daily
Weekly
Yearly
Less often than yearly
Irregular at events
Which life-stage of fish is measure aimed at Spawning / Recruitment
Juveniles
Adult fish
Movements and migration of fish
Which physical parameter is addressed Barriers
Flow quantity
Flow variations
Substrate and hyporheic zone
Water temperature
Ice
Water velocity
Water depth
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for Up to 10
Up to 20
Up to 50
Higher than 10
All
Section in the regulated system measure is designed for In dam/power plant
Upstream of hydropower plant
Bypass section
Downstream outlet
River type implemented Steep gradient (up to 0.4 %)
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
Slow flowing, lowland, sandy (less than 0.05 %)
Level of certainty in effect Very certain
Moderately certain
Uncertain
Very uncertain
Technology readiness level TRL 1: basic principles observed
TRL 2: technology concept formulated
TRL 3: experimental proof of concept
TRL 4: technology validated in lab
TRL 5: technology validated in relevant environment)
TRL 6: technology demonstrated in relevant environment)
TRL 7: system prototype demonstration in operational environment
TRL 8: system complete and qualified
TRL 9: actual system proven in operational environment