Difference between revisions of "Template:Removal of bank protection"

From FIThydrowiki
Jump to navigation Jump to search
(Updating classification tables: minor formatting fix)
(Updating classification tables: Adding FIThydro colors)
Line 1: Line 1:
 
{| class="wikitable"
 
{| class="wikitable"
 +
! colspan="2" style="text-align: center; background-color:#2cb4da; color:#ffffff;" |Removal of bank protection
 +
|-
 
! Classification !! Selection
 
! Classification !! Selection
 
|-
 
|-

Revision as of 14:35, 16 January 2020

Removal of bank protection
Classification Selection
Fish species for the measure All
Does the measure require loss of power production -
-
Structural (requires no additional flow release)
Recurrence of maintenance Never
Which life-stage of fish is measure aimed at Spawning / Recruitment
Juveniles
Adult fish
-
Which physical parameter is addressed -
-
-
Substrate and hyporheic zone
-
-
-
-
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for -
-
Bypass section
Downstream outlet
River type implemented Steep gradient (up to 0.4 %)
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
Slow flowing, lowland, sandy (less than 0.05 %)
Level of certainty in effect Very certain
Technology readiness level TRL 9: actual system proven in operational environment