Difference between revisions of "Template:Operational measures (turbine operations, spillway passage)"

From FIThydrowiki
Jump to navigation Jump to search
(Updating classification tables: changing available parameters)
(Updating classification tables: minor formatting fix)
Line 36: Line 36:
 
||-
 
||-
 
|-
 
|-
|rowspan = "2"|||[[Hydropower type the measure is suitable for::Plant in dam]]
+
|rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
 
|-
 
|-
 
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
 
||[[Hydropower type the measure is suitable for::Plant with bypass section]]

Revision as of 08:17, 16 January 2020

Classification Selection
Fish species for the measure All
Does the measure require loss of power production Operational (requires flow release outside turbine)
Operational (requires flow release through turbine)
-
Recurrence of maintenance Never
Which life-stage of fish is measure aimed at -
-
-
Movements and migration of fish
Which physical parameter is addressed Barriers
-
-
-
-
-
-
-
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for In dam/power plant
-
-
-
River type implemented Steep gradient (up to 0.4 %)
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
Slow flowing, lowland, sandy (less than 0.05 %)
Level of certainty in effect Moderately certain
Technology readiness level TRL 9: actual system proven in operational environment