Difference between revisions of "Template:Minimizing the sediment arrival to the reservoir"

From FIThydrowiki
Jump to navigation Jump to search
(Updating classification tables: changing available parameters)
(Updating classification tables: changing available parameters)
Line 20: Line 20:
 
||-
 
||-
 
|-
 
|-
|rowspan = "9"|Which physical parameter is addressed||-
+
|rowspan = "8"|Which physical parameter is addressed||-
 
|-
 
|-
 
||-
 
||-

Revision as of 11:50, 15 January 2020

Classification Selection
Fish species for the measure All
Does the measure require loss of power production Operational (requires flow release outside turbine)
-
-
Recurrence of maintenance Irregular at events
Which life-stage of fish is measure aimed at Spawning / Recruitment
Juveniles
Adult fish
-
Which physical parameter is addressed -
-
-
Substrate and hyporheic zone
-
-
-
-
rowspan = "2" Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for -
Upstream of hydropower plant
Bypass section
-
River type implemented Steep gradient (up to 0.4 %)
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
Slow flowing, lowland, sandy (less than 0.05 %)
Level of certainty in effect Very certain
Technology readiness level TRL 9: actual system proven in operational environment