Difference between revisions of "Template:Truck transport"

From FIThydrowiki
Jump to navigation Jump to search
(Updating classification tables: changing available parameters)
(Updating classification tables: changing available parameters)
Line 10: Line 10:
 
||[[Does the measure require loss of power production::Structural (requires no additional flow release)]]
 
||[[Does the measure require loss of power production::Structural (requires no additional flow release)]]
 
|-
 
|-
||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]]
+
||Recurrence of maintenance||[[Recurrence of maintenance::Never]]
 
|-
 
|-
 
|rowspan = "4"|Which life-stage of fish is measure aimed at||-
 
|rowspan = "4"|Which life-stage of fish is measure aimed at||-
Line 20: Line 20:
 
||[[Which life-stage of fish is measure aimed at::Movements and migration of fish]]
 
||[[Which life-stage of fish is measure aimed at::Movements and migration of fish]]
 
|-
 
|-
|rowspan = "9"|Which physical parameter is mitigated||-
+
|rowspan = "9"|Which physical parameter is addressed||[[Which physical parameter is addressed::Barriers]]
|-
 
||[[Which physical parameter is mitigated::Barriers]]
 
 
|-
 
|-
 
||-
 
||-
Line 38: Line 36:
 
||-
 
||-
 
|-
 
|-
|rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
+
|rowspan = "2"|||[[Hydropower type the measure is suitable for::Plant in dam]]
 
|-
 
|-
 
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
 
||[[Hydropower type the measure is suitable for::Plant with bypass section]]

Revision as of 11:40, 15 January 2020

Classification Selection
Fish species for the measure All
Does the measure require loss of power production -
-
Structural (requires no additional flow release)
Recurrence of maintenance Never
Which life-stage of fish is measure aimed at -
-
-
Movements and migration of fish
Which physical parameter is addressed Barriers
-
-
-
-
-
-
-
rowspan = "2" Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for In dam/power plant
-
-
-
River type implemented Steep gradient (up to 0.4 %)
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
Slow flowing, lowland, sandy (less than 0.05 %)
Level of certainty in effect Moderately certain
Technology readiness level TRL 8: system complete and qualified