Line 12: Line 12:
 
||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]]
 
||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]]
 
|-
 
|-
|rowspan = "4"|Which life-stage of fish is measure aimed at||-
+
|rowspan = "4"|Which life-stage of fish is measure aimed at||[[Which life-stage of fish is measure aimed at::Spawning / Recruitment]]
 
|-
 
|-
||-
+
||[[Which life-stage of fish is measure aimed at::Juveniles]]
 
|-
 
|-
||-
+
||[[Which life-stage of fish is measure aimed at::Adult fish]]
 
|-
 
|-
 
||[[Which life-stage of fish is measure aimed at::Movements and migration of fish]]
 
||[[Which life-stage of fish is measure aimed at::Movements and migration of fish]]
 
|-
 
|-
|rowspan = "9"|Which physical parameter is mitigated||[[Which physical parameter is mitigated::N/A]]
+
|rowspan = "9"|Which physical parameter is addressed||[[Which physical parameter is addressed::Barriers]]
|-
 
||[[Which physical parameter is mitigated::Barriers]]
 
 
|-
 
|-
 
||-
 
||-
Line 38: Line 36:
 
||-
 
||-
 
|-
 
|-
|rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
+
|rowspan = "2"|||[[Hydropower type the measure is suitable for::Plant in dam]]
 
|-
 
|-
 
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
 
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
Line 48: Line 46:
 
||-
 
||-
 
|-
 
|-
||-
+
||[[Section in the regulated system measure is designed for::Bypass section]]
 
|-
 
|-
 
||-
 
||-

Revision as of 11:40, 15 January 2020

Classification Selection
Fish species for the measure All
Does the measure require loss of power production Operational (requires flow release outside turbine)
-
-
Recurrence of maintenance Irregular at events
Which life-stage of fish is measure aimed at Spawning / Recruitment
Juveniles
Adult fish
Movements and migration of fish
Which physical parameter is addressed Barriers
-
-
-
-
-
-
-
rowspan = "2" Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for Up to 20
Section in the regulated system measure is designed for In dam/power plant
-
Bypass section
-
River type implemented Steep gradient (up to 0.4 %)
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
Slow flowing, lowland, sandy (less than 0.05 %)
Level of certainty in effect Moderately certain
Technology readiness level TRL 9: actual system proven in operational environment