Difference between revisions of "Template:Truck transport"

From FIThydrowiki
Jump to navigation Jump to search
(Making templates for classification tables)
(Making templates for classification tables)
Line 48: Line 48:
 
|rowspan = "4"|Section in the regulated system measure is designed for||[[Section in the regulated system measure is designed for::In dam/power plant]]
 
|rowspan = "4"|Section in the regulated system measure is designed for||[[Section in the regulated system measure is designed for::In dam/power plant]]
 
|-
 
|-
||-
+
||[[Section in the regulated system measure is designed for::Upstream of hydropower plant]]
 
|-
 
|-
||-
+
||[[Section in the regulated system measure is designed for::Bypass section]]
 
|-
 
|-
||-
+
||[[Section in the regulated system measure is designed for::Downstream outlet]]
 
|-
 
|-
|rowspan = "3"|River type implemented||-
+
|rowspan = "3"|River type implemented||[[Section in the regulated system measure is designed for::Bypass section]]
 
|-
 
|-
 
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]
 
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]
Line 60: Line 60:
 
||[[River type implemented::Slow flowing, lowland, sandy (less than 0.05 %)]]
 
||[[River type implemented::Slow flowing, lowland, sandy (less than 0.05 %)]]
 
|-
 
|-
||Level of certainty in effect||[[Level of certainty in effect::Very uncertain]]
+
||Level of certainty in effect||[[Level of certainty in effect::Moderately certain]]
 
|-
 
|-
||Technology readiness level||[[Technology readiness level::TRL 7: system prototype demonstration in operational environment]]
+
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]]
 
|}
 
|}

Revision as of 10:12, 28 October 2019

Classification Selection
Fish species for the measure All
Does the measure require loss of power production -
-
Structural (requires no additional flow release)
Recurrence of maintenance Irregular at events
Which life-stage of fish is measure aimed at -
-
-
-
-
Movements of migration of fish
Which physical parameter is mitigated N/A
-
-
-
-
-
-
-
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for In dam/power plant
Upstream of hydropower plant
Bypass section
Downstream outlet
River type implemented Bypass section
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
Slow flowing, lowland, sandy (less than 0.05 %)
Level of certainty in effect Moderately certain
Technology readiness level TRL 9: actual system proven in operational environment