Difference between revisions of "Template:Complete or partial migration barrier removal"
Jump to navigation
Jump to search
(Making templates for classification tables) |
(Making templates for classification tables) |
||
Line 4: | Line 4: | ||
|Fish species for the measure||[[Fish species for the measure::All]] | |Fish species for the measure||[[Fish species for the measure::All]] | ||
|- | |- | ||
− | |rowspan = "3"|Does the measure require loss of power production|| | + | |rowspan = "3"|Does the measure require loss of power production||- |
|- | |- | ||
||- | ||- | ||
|- | |- | ||
− | || | + | ||[[Does the measure require loss of power production::Structural (requires no additional flow release)]] |
|- | |- | ||
||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]] | ||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]] | ||
Line 44: | Line 44: | ||
||[[Hydropower type the measure is suitable for::Plant with bypass section]] | ||[[Hydropower type the measure is suitable for::Plant with bypass section]] | ||
|- | |- | ||
− | ||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for:: | + | ||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::Up to 20]] |
|- | |- | ||
|rowspan = "4"|Section in the regulated system measure is designed for||[[Section in the regulated system measure is designed for::In dam/power plant]] | |rowspan = "4"|Section in the regulated system measure is designed for||[[Section in the regulated system measure is designed for::In dam/power plant]] | ||
Line 60: | Line 60: | ||
||[[River type implemented::Slow flowing, lowland, sandy (less than 0.05 %)]] | ||[[River type implemented::Slow flowing, lowland, sandy (less than 0.05 %)]] | ||
|- | |- | ||
− | ||Level of certainty in effect||[[Level of certainty in effect:: | + | ||Level of certainty in effect||[[Level of certainty in effect::Moderately certain]] |
|- | |- | ||
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]] | ||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]] | ||
|} | |} |
Revision as of 10:12, 28 October 2019
Classification | Selection |
---|---|
Fish species for the measure | All |
Does the measure require loss of power production | - |
- | |
Structural (requires no additional flow release) | |
Recurrence of maintenance | Irregular at events |
Which life-stage of fish is measure aimed at | - |
- | |
- | |
- | |
- | |
Movements of migration of fish | |
Which physical parameter is mitigated | N/A |
- | |
- | |
- | |
- | |
- | |
- | |
- | |
Hydropower type the measure is suitable for | Plant in dam |
Plant with bypass section | |
Dam height (m) the measure is suitable for | Up to 20 |
Section in the regulated system measure is designed for | In dam/power plant |
- | |
- | |
- | |
River type implemented | - |
Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
Slow flowing, lowland, sandy (less than 0.05 %) | |
Level of certainty in effect | Moderately certain |
Technology readiness level | TRL 9: actual system proven in operational environment |