Difference between revisions of "Template:By-passing sediments"

From FIThydrowiki
Jump to navigation Jump to search
(Created blank page)
 
(Making templates for classification tables)
Line 1: Line 1:
 
+
By-passing sediments
 +
{| class="wikitable"
 +
! Classification !! Selection
 +
|-
 +
|Fish species for the measure||[[Fish species for the measure::All]]
 +
|-
 +
|rowspan = "3"|Does the measure require loss of power production||[[Does the measure require loss of power production::Operational (requires flow release outside turbine)]]
 +
|-
 +
||-
 +
|-
 +
||-
 +
|-
 +
||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]]
 +
|-
 +
|rowspan = "6"|Which life-stage of fish is measure aimed at||[[Which life-stage of fish is measure aimed at::Spawning / Recruitment]]
 +
|-
 +
||[[Which life-stage of fish is measure aimed at::Juvenile habitat (0+)]]
 +
|-
 +
||[[Which life-stage of fish is measure aimed at::Juvenile habitat (1+)]]
 +
|-
 +
||[[Which life-stage of fish is measure aimed at::Juvenile habitat (older than 1+)]]
 +
|-
 +
||[[Which life-stage of fish is measure aimed at::Adult fish]]
 +
|-
 +
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]]
 +
|-
 +
|rowspan = "8"|Which physical parameter is mitigated||-
 +
|-
 +
||-
 +
|-
 +
||-
 +
|-
 +
||[[Which physical parameter is mitigated::Substrate and hyporheic zone]]
 +
|-
 +
||-
 +
|-
 +
||-
 +
|-
 +
||-
 +
|-
 +
||-
 +
|-
 +
|rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
 +
|-
 +
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
 +
|-
 +
||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::Higher than 10]]
 +
|-
 +
|rowspan = "4"|Section in the regulated system measure is designed for||-
 +
|-
 +
||-
 +
|-
 +
||[[Section in the regulated system measure is designed for::Bypass section]]
 +
|-
 +
||[[Section in the regulated system measure is designed for::Downstream outlet]]
 +
|-
 +
|rowspan = "3"|River type implemented||[[Section in the regulated system measure is designed for::Bypass section]]
 +
|-
 +
||-
 +
|-
 +
||-
 +
|-
 +
||Level of certainty in effect||[[Level of certainty in effect::Moderately certain]]
 +
|-
 +
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]]
 +
|}

Revision as of 09:15, 28 October 2019

By-passing sediments

Classification Selection
Fish species for the measure All
Does the measure require loss of power production Operational (requires flow release outside turbine)
-
-
Recurrence of maintenance Irregular at events
Which life-stage of fish is measure aimed at Spawning / Recruitment
Juvenile habitat (0+)
Juvenile habitat (1+)
Juvenile habitat (older than 1+)
Adult fish
Movements of migration of fish
Which physical parameter is mitigated -
-
-
Substrate and hyporheic zone
-
-
-
-
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for Higher than 10
Section in the regulated system measure is designed for -
-
Bypass section
Downstream outlet
River type implemented Bypass section
-
-
Level of certainty in effect Moderately certain
Technology readiness level TRL 9: actual system proven in operational environment