Difference between revisions of "Fish guidance structures with narrow bar spacing"
Jump to navigation
Jump to search
Bendikhansen (talk | contribs) |
Bendikhansen (talk | contribs) |
||
Line 1: | Line 1: | ||
[[file:icon_downstream.png|right|150px|link=[[Downstream fish migration]]]] | [[file:icon_downstream.png|right|150px|link=[[Downstream fish migration]]]] | ||
{{Note|This technology has been enhanced in the FIThydro project! See [[Innovative technologies from FIThydro]] for a complete list.|reminder}} | {{Note|This technology has been enhanced in the FIThydro project! See [[Innovative technologies from FIThydro]] for a complete list.|reminder}} | ||
+ | '''Note: This article will be finished with the submission of deliverable 3.3 and 3.4 in October, 2020''' | ||
=Introduction= | =Introduction= | ||
Revision as of 11:58, 30 September 2020
This technology has been enhanced in the FIThydro project! See Innovative technologies from FIThydro for a complete list.
Note: This article will be finished with the submission of deliverable 3.3 and 3.4 in October, 2020
Contents
Introduction
Methods, tools, and devices
During planning
During implementation
During operation
Relevant MTDs and test cases
Classification table
Classification | Selection |
---|---|
Fish species for the measure | All |
Does the measure require loss of power production | Operational (requires flow release outside turbine) |
- | |
- | |
Recurrence of maintenance | Yearly |
Which life-stage of fish is measure aimed at | - |
- | |
- | |
Movements of migration of fish | |
Which physical parameter is addressed | N/A |
- | |
- | |
- | |
- | |
- | |
- | |
- | |
Hydropower type the measure is suitable for | Plant in dam |
Plant with bypass section | |
Dam height (m) the measure is suitable for | Up to 10 |
Section in the regulated system measure is designed for | In dam/power plant |
- | |
- | |
- | |
River type implemented | Steep gradient (up to 0.4 %) |
Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
Slow flowing, lowland, sandy (less than 0.05 %) | |
Level of certainty in effect | Very certain |
Technology readiness level | TRL 9: actual system proven in operational environment |
Cost of solution | See cost table |