− | |rowspan = "8"|Which physical parameter is | + | |rowspan = "8"|Which physical parameter is addressed||- |
|- | |- | ||
||- | ||- | ||
Line 30: | Line 30: | ||
||- | ||- | ||
|- | |- | ||
− | ||[[Which physical parameter is | + | ||[[Which physical parameter is addressed::Substrate and hyporheic zone]] |
|- | |- | ||
||- | ||- |
Revision as of 12:21, 2 July 2020
Classification | Selection |
---|---|
Fish species for the measure | 0 |
Does the measure require loss of power production | - |
- | |
Structural (requires no additional flow release) | |
Recurrence of maintenance | Less often than yearly |
Which life-stage of fish is measure aimed at | Spawning / Recruitment |
- | |
- | |
- | |
- | |
- | |
Which physical parameter is addressed | - |
- | |
- | |
Substrate and hyporheic zone | |
- | |
- | |
- | |
- | |
Hydropower type the measure is suitable for | Plant in dam |
Plant with bypass section | |
Dam height (m) the measure is suitable for | All |
Section in the regulated system measure is designed for | - |
Upstream of hydropower plant | |
Bypass section | |
Downstream outlet | |
River type implemented | Bypass section |
Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
- | |
Level of certainty in effect | Very certain |
Technology readiness level | TRL 9: actual system proven in operational environment |