Difference between revisions of "Template:Fact box for Guma and Vadocondes"

From FIThydrowiki
Jump to navigation Jump to search
(Adding pdfs to fact boxes)
(Adding pdfs to fact boxes)
Line 22: Line 22:
 
| Turbine(s)
 
| Turbine(s)
 
| 2 Kaplan turbines at each HPP
 
| 2 Kaplan turbines at each HPP
|}
+
|-
 
| Detailed report
 
| Detailed report
 
|[[file:testcase_presentation_Guma and Vadocondes.pdf]]
 
|[[file:testcase_presentation_Guma and Vadocondes.pdf]]
 
|}
 
|}

Revision as of 10:13, 22 January 2020

Fact box: Guma and Vadocondes
Country Spain
River Duero
Operator SAVASA
Capacity Guma: 2.25 MW, Vadocondes: 1 MW
Head Guma: 8.85 m, Vadocondes: 3.75 m
Inter-annual discharge 17.6 m³/s
Turbine(s) 2 Kaplan turbines at each HPP
Detailed report File:Testcase presentation Guma and Vadocondes.pdf