Difference between revisions of "Template:Fact box for Guma and Vadocondes"

From FIThydrowiki
Jump to navigation Jump to search
(Creating templates for test-case fact-boxes)
 
(Creating templates for test-case fact-boxes)
Line 18: Line 18:
 
|-
 
|-
 
| Inter-annual discharge
 
| Inter-annual discharge
| 17.6 /s
+
| 17.6 /s
 
|-
 
|-
 
| Turbine(s)
 
| Turbine(s)
 
| 2 Kaplan turbines at each HPP
 
| 2 Kaplan turbines at each HPP
 
|}
 
|}

Revision as of 12:07, 21 January 2020

Fact box: Guma and Vadocondes
Country Spain
River Duero
Operator SAVASA
Capacity Guma: 2.25 MW, Vadocondes: 1 MW
Head Guma: 8.85 m, Vadocondes: 3.75 m
Inter-annual discharge 17.6 m³/s
Turbine(s) 2 Kaplan turbines at each HPP