! colspan="2" style="text-align: center; background-color:#2cb4da; color:#ffffff;" |Bypass combined with other solutions
 
|-
 
 
! Classification !! Selection
 
! Classification !! Selection
 
|-
 
|-
Line 14: Line 12:
 
||Recurrence of maintenance||[[Recurrence of maintenance::Weekly]]
 
||Recurrence of maintenance||[[Recurrence of maintenance::Weekly]]
 
|-
 
|-
|rowspan = "4"|Which life-stage of fish is measure aimed at||-
+
|rowspan = "6"|Which life-stage of fish is measure aimed at||-
 +
|-
 +
||-
 +
|-
 +
||-
 
|-
 
|-
 
||-
 
||-
Line 20: Line 22:
 
||-
 
||-
 
|-
 
|-
||[[Which life-stage of fish is measure aimed at::Movements and migration of fish]]
+
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]]
 
|-
 
|-
|rowspan = "8"|Which physical parameter is addressed||[[Which physical parameter is addressed::Barriers]]
+
|rowspan = "8"|Which physical parameter is addressed||[[Which physical parameter is addressed::N/A]]
 
|-
 
|-
 
||-
 
||-
Line 52: Line 54:
 
||-
 
||-
 
|-
 
|-
|rowspan = "3"|River type implemented||[[River type implemented::Steep gradient (up to 0.4 %)]]
+
|rowspan = "3"|River type implemented||-
 
|-
 
|-
 
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]
 
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]
Line 60: Line 62:
 
||Level of certainty in effect||[[Level of certainty in effect::Moderately certain]]
 
||Level of certainty in effect||[[Level of certainty in effect::Moderately certain]]
 
|-
 
|-
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]]
+
||Technology readiness level||[[Technology readiness level::TRL 8: system complete and qualified]]
 +
|-
 +
||Cost of solution||See [[Costs of solutions|cost table]]
 
|}
 
|}

Revision as of 12:53, 30 September 2020

Classification Selection
Fish species for the measure All
Does the measure require loss of power production Operational (requires flow release outside turbine)
-
-
Recurrence of maintenance Weekly
Which life-stage of fish is measure aimed at -
-
-
-
-
Movements of migration of fish
Which physical parameter is addressed N/A
-
-
-
-
-
-
-
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for In dam/power plant
-
-
-
River type implemented -
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
Slow flowing, lowland, sandy (less than 0.05 %)
Level of certainty in effect Moderately certain
Technology readiness level TRL 8: system complete and qualified
Cost of solution See cost table