! colspan="2" style="text-align: center; background-color:#2cb4da; color:#ffffff;" |Operational measures (turbine operations, spillway passage)
 
|-
 
 
! Classification !! Selection
 
! Classification !! Selection
 
|-
 
|-
Line 8: Line 6:
 
|rowspan = "3"|Does the measure require loss of power production||[[Does the measure require loss of power production::Operational (requires flow release outside turbine)]]
 
|rowspan = "3"|Does the measure require loss of power production||[[Does the measure require loss of power production::Operational (requires flow release outside turbine)]]
 
|-
 
|-
||[[Does the measure require loss of power production::Operational (requires flow release through turbine)]]
+
||-
 
|-
 
|-
 
||-
 
||-
 
|-
 
|-
||Recurrence of maintenance||[[Recurrence of maintenance::Never]]
+
||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]]
 +
|-
 +
|rowspan = "6"|Which life-stage of fish is measure aimed at||-
 +
|-
 +
||-
 
|-
 
|-
|rowspan = "4"|Which life-stage of fish is measure aimed at||-
+
||-
 
|-
 
|-
 
||-
 
||-
Line 20: Line 22:
 
||-
 
||-
 
|-
 
|-
||[[Which life-stage of fish is measure aimed at::Movements and migration of fish]]
+
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]]
 
|-
 
|-
|rowspan = "8"|Which physical parameter is addressed||[[Which physical parameter is addressed::Barriers]]
+
|rowspan = "8"|Which physical parameter is mitigated||[[Which physical parameter is mitigated::N/A]]
 
|-
 
|-
 
||-
 
||-
Line 48: Line 50:
 
||-
 
||-
 
|-
 
|-
||-
+
||[[Section in the regulated system measure is designed for::Bypass section]]
 
|-
 
|-
||-
+
||[[Section in the regulated system measure is designed for::Downstream outlet]]
 
|-
 
|-
|rowspan = "3"|River type implemented||[[River type implemented::Steep gradient (up to 0.4 %)]]
+
|rowspan = "3"|River type implemented||[[Section in the regulated system measure is designed for::Bypass section]]
 
|-
 
|-
 
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]
 
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]

Revision as of 12:13, 2 July 2020

Classification Selection
Fish species for the measure All
Does the measure require loss of power production Operational (requires flow release outside turbine)
-
-
Recurrence of maintenance Irregular at events
Which life-stage of fish is measure aimed at -
-
-
-
-
Movements of migration of fish
Which physical parameter is mitigated N/A
-
-
-
-
-
-
-
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for In dam/power plant
-
Bypass section
Downstream outlet
River type implemented Bypass section
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
Slow flowing, lowland, sandy (less than 0.05 %)
Level of certainty in effect Moderately certain
Technology readiness level TRL 9: actual system proven in operational environment