Difference between revisions of "Template:Complete or partial migration barrier removal"
Jump to navigation
Jump to search
(Updating classification tables: changing available parameters) |
(Updating classification tables: changing available parameters) |
||
Line 20: | Line 20: | ||
||[[Which life-stage of fish is measure aimed at::Movements and migration of fish]] | ||[[Which life-stage of fish is measure aimed at::Movements and migration of fish]] | ||
|- | |- | ||
− | |rowspan = " | + | |rowspan = "8"|Which physical parameter is addressed||[[Which physical parameter is addressed::Barriers]] |
|- | |- | ||
||- | ||- |
Revision as of 11:50, 15 January 2020
Classification | Selection |
---|---|
Fish species for the measure | All |
Does the measure require loss of power production | - |
- | |
Structural (requires no additional flow release) | |
Recurrence of maintenance | Never |
Which life-stage of fish is measure aimed at | - |
- | |
- | |
Movements and migration of fish | |
Which physical parameter is addressed | Barriers |
- | |
- | |
- | |
- | |
- | |
- | |
- | |
rowspan = "2" | Plant in dam |
Plant with bypass section | |
Dam height (m) the measure is suitable for | Up to 20 |
Section in the regulated system measure is designed for | In dam/power plant |
- | |
- | |
- | |
River type implemented | Steep gradient (up to 0.4 %) |
Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
Slow flowing, lowland, sandy (less than 0.05 %) | |
Level of certainty in effect | Moderately certain |
Technology readiness level | TRL 9: actual system proven in operational environment |