Difference between revisions of "Template:Environmental design of embankments and erosion protection"
Jump to navigation
Jump to search
(Updating classification tables: changing available parameters) |
(Updating classification tables: changing available parameters) |
||
Line 12: | Line 12: | ||
||Recurrence of maintenance||[[Recurrence of maintenance::Less often than yearly]] | ||Recurrence of maintenance||[[Recurrence of maintenance::Less often than yearly]] | ||
|- | |- | ||
− | |rowspan = "4"|Which life-stage of fish is measure aimed at|| | + | |rowspan = "4"|Which life-stage of fish is measure aimed at||- |
|- | |- | ||
||[[Which life-stage of fish is measure aimed at::Juveniles]] | ||[[Which life-stage of fish is measure aimed at::Juveniles]] | ||
Line 18: | Line 18: | ||
||[[Which life-stage of fish is measure aimed at::Adult fish]] | ||[[Which life-stage of fish is measure aimed at::Adult fish]] | ||
|- | |- | ||
− | || | + | ||- |
|- | |- | ||
− | |rowspan = "9"|Which physical parameter is | + | |rowspan = "9"|Which physical parameter is addressed||- |
|- | |- | ||
||- | ||- | ||
|- | |- | ||
||- | ||- | ||
+ | |- | ||
+ | ||[[Which physical parameter is addressed::Substrate and hyporheic zone]] | ||
|- | |- | ||
||- | ||- | ||
|- | |- | ||
− | || | + | ||- |
|- | |- | ||
||- | ||- | ||
Line 34: | Line 36: | ||
||- | ||- | ||
|- | |- | ||
− | + | |rowspan = "2"|||[[Hydropower type the measure is suitable for::Plant in dam]] | |
− | |||
− | |||
− | |||
− | |rowspan = "2"| | ||
|- | |- | ||
||[[Hydropower type the measure is suitable for::Plant with bypass section]] | ||[[Hydropower type the measure is suitable for::Plant with bypass section]] |
Revision as of 11:40, 15 January 2020
Classification | Selection |
---|---|
Fish species for the measure | All |
Does the measure require loss of power production | - |
- | |
Structural (requires no additional flow release) | |
Recurrence of maintenance | Less often than yearly |
Which life-stage of fish is measure aimed at | - |
Juveniles | |
Adult fish | |
- | |
Which physical parameter is addressed | - |
- | |
- | |
Substrate and hyporheic zone | |
- | |
- | |
- | |
- | |
rowspan = "2" | Plant in dam |
Plant with bypass section | |
Dam height (m) the measure is suitable for | All |
Section in the regulated system measure is designed for | - |
- | |
Bypass section | |
Downstream outlet | |
River type implemented | Steep gradient (up to 0.4 %) |
Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
Slow flowing, lowland, sandy (less than 0.05 %) | |
Level of certainty in effect | Moderately certain |
Technology readiness level | TRL 9: actual system proven in operational environment |