Difference between revisions of "Template:Off-channel reservoir storage"

From FIThydrowiki
Jump to navigation Jump to search
(Making templates for classification tables)
(Making templates for classification tables)
Line 50: Line 50:
 
||-
 
||-
 
|-
 
|-
||-
+
||[[Section in the regulated system measure is designed for::Bypass section]]
 
|-
 
|-
 
||[[Section in the regulated system measure is designed for::Downstream outlet]]
 
||[[Section in the regulated system measure is designed for::Downstream outlet]]
 
|-
 
|-
|rowspan = "3"|River type implemented||-
+
|rowspan = "3"|River type implemented||[[Section in the regulated system measure is designed for::Bypass section]]
 
|-
 
|-
 
||-
 
||-

Revision as of 10:12, 28 October 2019

Classification Selection
Fish species for the measure All
Does the measure require loss of power production Operational (requires flow release outside turbine)
-
-
Recurrence of maintenance Irregular at events
Which life-stage of fish is measure aimed at Spawning / Recruitment
Juvenile habitat (0+)
Juvenile habitat (1+)
Juvenile habitat (older than 1+)
Adult fish
Movements of migration of fish
Which physical parameter is mitigated -
-
-
Substrate and hyporheic zone
-
-
-
-
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for Higher than 10
Section in the regulated system measure is designed for -
-
Bypass section
Downstream outlet
River type implemented Bypass section
-
-
Level of certainty in effect Moderately certain
Technology readiness level TRL 9: actual system proven in operational environment