Difference between revisions of "Template:Complete or partial migration barrier removal"

From FIThydrowiki
Jump to navigation Jump to search
(Making templates for classification tables)
(Making templates for classification tables)
Line 1: Line 1:
Complete or partial migration barrier removal
 
 
{| class="wikitable"
 
{| class="wikitable"
 
! Classification !! Selection
 
! Classification !! Selection

Revision as of 09:38, 28 October 2019

Classification Selection
Fish species for the measure All
Does the measure require loss of power production Operational (requires flow release outside turbine)
-
-
Recurrence of maintenance Irregular at events
Which life-stage of fish is measure aimed at -
-
-
-
-
Movements of migration of fish
Which physical parameter is mitigated N/A
-
-
-
-
-
-
-
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for In dam/power plant
-
-
-
River type implemented -
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
Slow flowing, lowland, sandy (less than 0.05 %)
Level of certainty in effect Uncertain
Technology readiness level TRL 9: actual system proven in operational environment