Difference between revisions of "Template:Placement of spawning gravel in the river"

From FIThydrowiki
Jump to navigation Jump to search
(Updating classification tables: Adding FIThydro colors)
(Updating classification tables: minor changes)
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
{| class="wikitable"
 
{| class="wikitable"
! colspan="2" style="text-align: center; background-color:#2cb4da; color:#ffffff;" |Placement of spawning gravel in the river
 
|-
 
 
! Classification !! Selection
 
! Classification !! Selection
 
|-
 
|-
Line 22: Line 20:
 
||-
 
||-
 
|-
 
|-
|rowspan = "8"|Which physical parameter is addressed||-
+
|rowspan="8"|Which physical parameter is addressed||-
 
|-
 
|-
 
||-
 
||-
Line 38: Line 36:
 
||-
 
||-
 
|-
 
|-
|rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
+
|rowspan="2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
 
|-
 
|-
 
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
 
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
 
|-
 
|-
||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]]
+
|rowspan = "1"|Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]]
 
|-
 
|-
|rowspan = "4"|Section in the regulated system measure is designed for||-
+
|rowspan="4"|Section in the regulated system measure is designed for||-
 
|-
 
|-
||-
+
||[[Section in the regulated system measure is designed for::Upstream of hydropower plant]]
 
|-
 
|-
 
||[[Section in the regulated system measure is designed for::Bypass section]]
 
||[[Section in the regulated system measure is designed for::Bypass section]]
Line 61: Line 59:
 
|-
 
|-
 
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]]
 
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]]
 +
|-
 +
||Cost of solution||See [[Costs of solutions|cost table]]
 
|}
 
|}

Latest revision as of 13:48, 9 October 2020

Classification Selection
Fish species for the measure Gravel spawners
Does the measure require loss of power production -
-
Structural (requires no additional flow release)
Recurrence of maintenance Less often than yearly
Which life-stage of fish is measure aimed at Spawning / Recruitment
-
-
-
Which physical parameter is addressed -
-
-
Substrate and hyporheic zone
-
-
-
-
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for -
Upstream of hydropower plant
Bypass section
Downstream outlet
River type implemented Steep gradient (up to 0.4 %)
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
-
Level of certainty in effect Very certain
Technology readiness level TRL 9: actual system proven in operational environment
Cost of solution See cost table