Difference between revisions of "Template:Removal of bank protection"

From FIThydrowiki
Jump to navigation Jump to search
(Updating classification tables: changing available parameters)
(Updating classification tables: minor changes)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
! Classification !! Selection
 
! Classification !! Selection
 
|-
 
|-
|Fish species for the measure||[[Fish species for the measure::All]]
+
|Fish species for the measure||[[Fish species for the measure::0]]
 
|-
 
|-
 
|rowspan = "3"|Does the measure require loss of power production||-
 
|rowspan = "3"|Does the measure require loss of power production||-
Line 8: Line 8:
 
||-
 
||-
 
|-
 
|-
||[[Does the measure require loss of power production::Structural (requires no additional flow release)]]
+
||-
 +
|-
 +
#N/A
 
|-
 
|-
||Recurrence of maintenance||[[Recurrence of maintenance::Never]]
+
|rowspan = "6"|Which life-stage of fish is measure aimed at||-
 
|-
 
|-
|rowspan = "4"|Which life-stage of fish is measure aimed at||[[Which life-stage of fish is measure aimed at::Spawning / Recruitment]]
+
||-
 
|-
 
|-
||[[Which life-stage of fish is measure aimed at::Juveniles]]
+
||-
 
|-
 
|-
||[[Which life-stage of fish is measure aimed at::Adult fish]]
+
||-
 +
|-
 +
||-
 
|-
 
|-
 
||-
 
||-
Line 26: Line 30:
 
||-
 
||-
 
|-
 
|-
||[[Which physical parameter is addressed::Substrate and hyporheic zone]]
+
||-
 
|-
 
|-
 
||-
 
||-
Line 36: Line 40:
 
||-
 
||-
 
|-
 
|-
|rowspan = "2"|||[[Hydropower type the measure is suitable for::Plant in dam]]
+
|rowspan = "2"|Hydropower type the measure is suitable for||-
 
|-
 
|-
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
+
||-
 
|-
 
|-
||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]]
+
#N/A
 
|-
 
|-
 
|rowspan = "4"|Section in the regulated system measure is designed for||-
 
|rowspan = "4"|Section in the regulated system measure is designed for||-
Line 46: Line 50:
 
||-
 
||-
 
|-
 
|-
||[[Section in the regulated system measure is designed for::Bypass section]]
+
||-
 
|-
 
|-
||[[Section in the regulated system measure is designed for::Downstream outlet]]
+
||-
 
|-
 
|-
|rowspan = "3"|River type implemented||[[River type implemented::Steep gradient (up to 0.4 %)]]
+
|rowspan = "3"|River type implemented||-
 
|-
 
|-
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]
+
||-
 +
|-
 +
||-
 
|-
 
|-
||[[River type implemented::Slow flowing, lowland, sandy (less than 0.05 %)]]
+
#N/A
 
|-
 
|-
||Level of certainty in effect||[[Level of certainty in effect::Very certain]]
+
||Technology readiness level||[[Technology readiness level::TRL 8: system complete and qualified]]
 
|-
 
|-
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]]
+
||Cost of solution||See [[Costs of solutions|cost table]]
 
|}
 
|}

Latest revision as of 12:53, 30 September 2020

  1. N/A
  1. N/A
  1. N/A
Classification Selection
Fish species for the measure 0
Does the measure require loss of power production -
-
-
Which life-stage of fish is measure aimed at -
-
-
-
-
-
Which physical parameter is addressed -
-
-
-
-
-
-
-
Hydropower type the measure is suitable for -
-
Section in the regulated system measure is designed for -
-
-
-
River type implemented -
-
-
Technology readiness level TRL 8: system complete and qualified
Cost of solution See cost table