Difference between revisions of "Template:By-passing sediments"

From FIThydrowiki
Jump to navigation Jump to search
(Updating classification tables: changing available parameters)
(Updating classification tables: minor changes)
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
! Classification !! Selection
 
! Classification !! Selection
 
|-
 
|-
|Fish species for the measure||[[Fish species for the measure::All]]
+
|Fish species for the measure||[[Fish species for the measure::Gravel spawners]]
 
|-
 
|-
 
|rowspan = "3"|Does the measure require loss of power production||[[Does the measure require loss of power production::Operational (requires flow release outside turbine)]]
 
|rowspan = "3"|Does the measure require loss of power production||[[Does the measure require loss of power production::Operational (requires flow release outside turbine)]]
Line 18: Line 18:
 
||[[Which life-stage of fish is measure aimed at::Adult fish]]
 
||[[Which life-stage of fish is measure aimed at::Adult fish]]
 
|-
 
|-
||[[Which life-stage of fish is measure aimed at::Movements and migration of fish]]
+
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]]
 
|-
 
|-
|rowspan = "9"|Which physical parameter is mitigated||-
+
|rowspan="8"|Which physical parameter is addressed||-
 
|-
 
|-
 
||-
 
||-
Line 26: Line 26:
 
||-
 
||-
 
|-
 
|-
||-
+
||[[Which physical parameter is addressed::Substrate and hyporheic zone]]
|-
 
||[[Which physical parameter is mitigated::Substrate and hyporheic zone]]
 
 
|-
 
|-
 
||-
 
||-
Line 38: Line 36:
 
||-
 
||-
 
|-
 
|-
|rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
+
|rowspan="2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
 
|-
 
|-
 
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
 
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
 
|-
 
|-
||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::Higher than 10]]
+
|rowspan = "1"|Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::Higher than 10]]
 
|-
 
|-
|rowspan = "4"|Section in the regulated system measure is designed for||-
+
|rowspan="4"|Section in the regulated system measure is designed for||-
 
|-
 
|-
 
||-
 
||-
Line 61: Line 59:
 
|-
 
|-
 
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]]
 
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]]
 +
|-
 +
||Cost of solution||See [[Costs of solutions|cost table]]
 
|}
 
|}

Latest revision as of 13:48, 9 October 2020

Classification Selection
Fish species for the measure Gravel spawners
Does the measure require loss of power production Operational (requires flow release outside turbine)
-
-
Recurrence of maintenance Irregular at events
Which life-stage of fish is measure aimed at Spawning / Recruitment
Juveniles
Adult fish
Movements of migration of fish
Which physical parameter is addressed -
-
-
Substrate and hyporheic zone
-
-
-
-
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for Higher than 10
Section in the regulated system measure is designed for -
-
-
Downstream outlet
River type implemented Steep gradient (up to 0.4 %)
-
-
Level of certainty in effect Moderately certain
Technology readiness level TRL 9: actual system proven in operational environment
Cost of solution See cost table