Difference between revisions of "Template:Fishways for eels and lampreys"

From FIThydrowiki
Jump to navigation Jump to search
(Making templates for classification tables)
(Updating classification tables: minor changes)
 
(11 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
! Classification !! Selection
 
! Classification !! Selection
 
|-
 
|-
|Fish species for the measure||[[Fish species for the measure::Eel and Lamprey]]
+
|Fish species for the measure||[[Fish species for the measure::All]]
 
|-
 
|-
 
|rowspan = "3"|Does the measure require loss of power production||[[Does the measure require loss of power production::Operational (requires flow release outside turbine)]]
 
|rowspan = "3"|Does the measure require loss of power production||[[Does the measure require loss of power production::Operational (requires flow release outside turbine)]]
Line 12: Line 12:
 
||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]]
 
||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]]
 
|-
 
|-
|rowspan = "6"|Which life-stage of fish is measure aimed at||-
+
|rowspan = "4"|Which life-stage of fish is measure aimed at||-
 
|-
 
|-
 
||-
 
||-
 
|-
 
|-
 
||-
 
||-
|-
 
||-
 
|-
 
||[[Which life-stage of fish is measure aimed at::Adult fish]]
 
 
|-
 
|-
 
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]]
 
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]]
 
|-
 
|-
|rowspan = "8"|Which physical parameter is mitigated||[[Which physical parameter is mitigated::N/A]]
+
|rowspan="8"|Which physical parameter is addressed||[[Which physical parameter is addressed::N/A]]
 
|-
 
|-
 
||-
 
||-
Line 40: Line 36:
 
||-
 
||-
 
|-
 
|-
|rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
+
|rowspan="2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
 
|-
 
|-
 
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
 
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
 
|-
 
|-
||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::Up to 20]]
+
|rowspan = "1"|Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::Up to 20]]
 
|-
 
|-
|rowspan = "4"|Section in the regulated system measure is designed for||[[Section in the regulated system measure is designed for::In dam/power plant]]
+
|rowspan="4"|Section in the regulated system measure is designed for||[[Section in the regulated system measure is designed for::In dam/power plant]]
 
|-
 
|-
 
||-
 
||-
Line 54: Line 50:
 
||-
 
||-
 
|-
 
|-
|rowspan = "3"|River type implemented||-
+
|rowspan = "3"|River type implemented||[[River type implemented::Steep gradient (up to 0.4 %)]]
 
|-
 
|-
 
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]
 
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]
Line 62: Line 58:
 
||Level of certainty in effect||[[Level of certainty in effect::Moderately certain]]
 
||Level of certainty in effect||[[Level of certainty in effect::Moderately certain]]
 
|-
 
|-
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]]
+
||Technology readiness level||[[Technology readiness level::TRL 8: system complete and qualified]]
 +
|-
 +
||Cost of solution||See [[Costs of solutions|cost table]]
 
|}
 
|}

Latest revision as of 13:48, 9 October 2020

Classification Selection
Fish species for the measure All
Does the measure require loss of power production Operational (requires flow release outside turbine)
-
-
Recurrence of maintenance Irregular at events
Which life-stage of fish is measure aimed at -
-
-
Movements of migration of fish
Which physical parameter is addressed N/A
-
-
-
-
-
-
-
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for Up to 20
Section in the regulated system measure is designed for In dam/power plant
-
-
-
River type implemented Steep gradient (up to 0.4 %)
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
Slow flowing, lowland, sandy (less than 0.05 %)
Level of certainty in effect Moderately certain
Technology readiness level TRL 8: system complete and qualified
Cost of solution See cost table