Difference between revisions of "Template:Truck transport"
Jump to navigation
Jump to search
(Making templates for classification tables) |
(Updating classification tables: minor changes) |
||
(13 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | |||
{| class="wikitable" | {| class="wikitable" | ||
! Classification !! Selection | ! Classification !! Selection | ||
Line 13: | Line 12: | ||
||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]] | ||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]] | ||
|- | |- | ||
− | |rowspan = " | + | |rowspan = "4"|Which life-stage of fish is measure aimed at||- |
− | |||
− | |||
− | |||
− | ||- | ||
|- | |- | ||
||- | ||- | ||
Line 25: | Line 20: | ||
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]] | ||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]] | ||
|- | |- | ||
− | |rowspan = "8"|Which physical parameter is | + | |rowspan="8"|Which physical parameter is addressed||[[Which physical parameter is addressed::N/A]] |
|- | |- | ||
||- | ||- | ||
Line 41: | Line 36: | ||
||- | ||- | ||
|- | |- | ||
− | |rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]] | + | |rowspan="2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]] |
|- | |- | ||
||[[Hydropower type the measure is suitable for::Plant with bypass section]] | ||[[Hydropower type the measure is suitable for::Plant with bypass section]] | ||
|- | |- | ||
− | ||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]] | + | |rowspan = "1"|Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]] |
|- | |- | ||
− | |rowspan = "4"|Section in the regulated system measure is designed for||[[Section in the regulated system measure is designed for::In dam/power plant]] | + | |rowspan="4"|Section in the regulated system measure is designed for||[[Section in the regulated system measure is designed for::In dam/power plant]] |
|- | |- | ||
− | || | + | ||[[Section in the regulated system measure is designed for::Upstream of hydropower plant]] |
|- | |- | ||
− | || | + | ||[[Section in the regulated system measure is designed for::Bypass section]] |
|- | |- | ||
− | || | + | ||[[Section in the regulated system measure is designed for::Downstream outlet]] |
|- | |- | ||
− | |rowspan = "3"|River type implemented|| | + | |rowspan = "3"|River type implemented||[[River type implemented::Steep gradient (up to 0.4 %)]] |
|- | |- | ||
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]] | ||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]] | ||
Line 61: | Line 56: | ||
||[[River type implemented::Slow flowing, lowland, sandy (less than 0.05 %)]] | ||[[River type implemented::Slow flowing, lowland, sandy (less than 0.05 %)]] | ||
|- | |- | ||
− | ||Level of certainty in effect||[[Level of certainty in effect:: | + | ||Level of certainty in effect||[[Level of certainty in effect::Moderately certain]] |
+ | |- | ||
+ | ||Technology readiness level||[[Technology readiness level::TRL 8: system complete and qualified]] | ||
|- | |- | ||
− | || | + | ||Cost of solution||See [[Costs of solutions|cost table]] |
|} | |} |
Latest revision as of 15:31, 26 January 2021
Classification | Selection |
---|---|
Fish species for the measure | All |
Does the measure require loss of power production | - |
- | |
Structural (requires no additional flow release) | |
Recurrence of maintenance | Irregular at events |
Which life-stage of fish is measure aimed at | - |
- | |
- | |
Movements of migration of fish | |
Which physical parameter is addressed | N/A |
- | |
- | |
- | |
- | |
- | |
- | |
- | |
Hydropower type the measure is suitable for | Plant in dam |
Plant with bypass section | |
Dam height (m) the measure is suitable for | All |
Section in the regulated system measure is designed for | In dam/power plant |
Upstream of hydropower plant | |
Bypass section | |
Downstream outlet | |
River type implemented | Steep gradient (up to 0.4 %) |
Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
Slow flowing, lowland, sandy (less than 0.05 %) | |
Level of certainty in effect | Moderately certain |
Technology readiness level | TRL 8: system complete and qualified |
Cost of solution | See cost table |