Difference between revisions of "Template:Truck transport"

From FIThydrowiki
Jump to navigation Jump to search
(Updating classification tables: minor changes)
(Updating classification tables: minor changes)
 
(2 intermediate revisions by the same user not shown)
Line 8: Line 8:
 
||-
 
||-
 
|-
 
|-
||-
+
||[[Does the measure require loss of power production::Structural (requires no additional flow release)]]
 
|-
 
|-
#N/A
+
||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]]
 
|-
 
|-
|rowspan = "6"|Which life-stage of fish is measure aimed at||-
+
|rowspan = "4"|Which life-stage of fish is measure aimed at||-
 
|-
 
|-
 
||-
 
||-
Line 18: Line 18:
 
||-
 
||-
 
|-
 
|-
||-
+
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]]
 
|-
 
|-
||-
+
|rowspan="8"|Which physical parameter is addressed||[[Which physical parameter is addressed::N/A]]
 
|-
 
|-
 
||-
 
||-
|-
 
|rowspan = "8"|Which physical parameter is addressed||-
 
 
|-
 
|-
 
||-
 
||-
Line 38: Line 36:
 
||-
 
||-
 
|-
 
|-
||-
+
|rowspan="2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
 
|-
 
|-
|rowspan = "2"|Hydropower type the measure is suitable for||-
+
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
 
|-
 
|-
||-
+
|rowspan = "1"|Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]]
 
|-
 
|-
#N/A
+
|rowspan="4"|Section in the regulated system measure is designed for||[[Section in the regulated system measure is designed for::In dam/power plant]]
 
|-
 
|-
|rowspan = "4"|Section in the regulated system measure is designed for||-
+
||[[Section in the regulated system measure is designed for::Upstream of hydropower plant]]
 
|-
 
|-
||-
+
||[[Section in the regulated system measure is designed for::Bypass section]]
 
|-
 
|-
||-
+
||[[Section in the regulated system measure is designed for::Downstream outlet]]
 
|-
 
|-
||-
+
|rowspan = "3"|River type implemented||[[River type implemented::Steep gradient (up to 0.4 %)]]
 
|-
 
|-
|rowspan = "3"|River type implemented||-
+
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]
 
|-
 
|-
||-
+
||[[River type implemented::Slow flowing, lowland, sandy (less than 0.05 %)]]
 
|-
 
|-
||-
+
||Level of certainty in effect||[[Level of certainty in effect::Moderately certain]]
 
|-
 
|-
#N/A
+
||Technology readiness level||[[Technology readiness level::TRL 8: system complete and qualified]]
 
|-
 
|-
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]]
+
||Cost of solution||See [[Costs of solutions|cost table]]
 
|}
 
|}

Latest revision as of 15:31, 26 January 2021

Classification Selection
Fish species for the measure All
Does the measure require loss of power production -
-
Structural (requires no additional flow release)
Recurrence of maintenance Irregular at events
Which life-stage of fish is measure aimed at -
-
-
Movements of migration of fish
Which physical parameter is addressed N/A
-
-
-
-
-
-
-
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for In dam/power plant
Upstream of hydropower plant
Bypass section
Downstream outlet
River type implemented Steep gradient (up to 0.4 %)
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
Slow flowing, lowland, sandy (less than 0.05 %)
Level of certainty in effect Moderately certain
Technology readiness level TRL 8: system complete and qualified
Cost of solution See cost table