Difference between revisions of "Template:Suitable measures for Structure from motion (SfM)"
Jump to navigation
Jump to search
(Importing MTD properties) |
(Importing MTD properties) |
||
Line 2: | Line 2: | ||
! colspan="2" style="text-align: center; background-color:#2cb4da; color:#ffffff;" |Relevant measures | ! colspan="2" style="text-align: center; background-color:#2cb4da; color:#ffffff;" |Relevant measures | ||
|- | |- | ||
− | + | Complete or partial migration barrier removal | |
|- | |- | ||
− | + | Construction of a 'river-in-the-river' | |
|- | |- | ||
− | + | Construction of off-channel habitats | |
|- | |- | ||
− | + | Environmental design of embankments and erosion protection | |
|- | |- | ||
− | + | Fish guidance structures with wide bar spacing | |
|- | |- | ||
− | + | Mitigating rapid, short-term variations in flow (hydro-peaking operations) | |
|- | |- | ||
− | + | Mitigating reduced annual flow and low flow measures | |
|- | |- | ||
− | + | Mitigating reduced flood peaks, magnitudes, and frequency | |
|- | |- | ||
− | + | Operational measures (turbine operations, spillway passage) | |
|- | |- | ||
− | + | Placement of dead wood and debris | |
|- | |- | ||
− | + | Placement of spawning gravel in the river | |
|- | |- | ||
− | + | Placement of stones in the river | |
|- | |- | ||
− | + | Restoration of the riparian zone vegetation | |
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
! colspan="1" style="text-align: center; background-color:#2cb4da; color:#ffffff;" |Relevant test cases !! colspan="1" style="text-align: center; background-color:#2cb4da; color:#ffffff;"|Applied in test case? | ! colspan="1" style="text-align: center; background-color:#2cb4da; color:#ffffff;" |Relevant test cases !! colspan="1" style="text-align: center; background-color:#2cb4da; color:#ffffff;"|Applied in test case? | ||
|- | |- | ||
− | + | Altheim||- | |
|- | |- | ||
− | + | Altusried||Yes | |
|- | |- | ||
− | + | Anundsjö||Yes | |
|- | |- | ||
− | + | Bannwil||- | |
|- | |- | ||
− | + | Freudenau||- | |
|- | |- | ||
− | + | Gotein||- | |
|- | |- | ||
− | + | Günz||Yes | |
|- | |- | ||
− | + | Ham||- | |
|- | |- | ||
− | + | Las Rives||- | |
|- | |- | ||
− | + | Schiffmühle||Yes | |
|- | |- | ||
− | + | Trois Villes||- | |
|} | |} |
Revision as of 14:01, 9 October 2020
Complete or partial migration barrier removal
Construction of a 'river-in-the-river'
Construction of off-channel habitats
Environmental design of embankments and erosion protection
Fish guidance structures with wide bar spacing
Mitigating rapid, short-term variations in flow (hydro-peaking operations)
Mitigating reduced annual flow and low flow measures
Mitigating reduced flood peaks, magnitudes, and frequency
Operational measures (turbine operations, spillway passage)
Placement of dead wood and debris
Placement of spawning gravel in the river
Placement of stones in the river
Restoration of the riparian zone vegetation
Altheim||-
Altusried||Yes
Anundsjö||Yes
Bannwil||-
Freudenau||-
Gotein||-
Günz||Yes
Ham||-
Las Rives||-
Schiffmühle||Yes
Trois Villes||-
Relevant measures | |
---|---|
Relevant test cases | Applied in test case? |