Difference between revisions of "Template:Placement of stones in the river"

From FIThydrowiki
Jump to navigation Jump to search
(Created blank page)
 
(Updating classification tables: minor changes)
 
(13 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
+
{| class="wikitable"
 +
! Classification !! Selection
 +
|-
 +
|Fish species for the measure||[[Fish species for the measure::All]]
 +
|-
 +
|rowspan = "3"|Does the measure require loss of power production||-
 +
|-
 +
||-
 +
|-
 +
||[[Does the measure require loss of power production::Structural (requires no additional flow release)]]
 +
|-
 +
||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]]
 +
|-
 +
|rowspan = "4"|Which life-stage of fish is measure aimed at||[[Which life-stage of fish is measure aimed at::Spawning / Recruitment]]
 +
|-
 +
||[[Which life-stage of fish is measure aimed at::Juveniles]]
 +
|-
 +
||[[Which life-stage of fish is measure aimed at::Adult fish]]
 +
|-
 +
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]]
 +
|-
 +
|rowspan="8"|Which physical parameter is addressed||-
 +
|-
 +
||-
 +
|-
 +
||-
 +
|-
 +
||[[Which physical parameter is addressed::Substrate and hyporheic zone]]
 +
|-
 +
||-
 +
|-
 +
||-
 +
|-
 +
||[[Which physical parameter is addressed::Water velocity]]
 +
|-
 +
||-
 +
|-
 +
|rowspan="2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
 +
|-
 +
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
 +
|-
 +
|rowspan = "1"|Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]]
 +
|-
 +
|rowspan="4"|Section in the regulated system measure is designed for||-
 +
|-
 +
||[[Section in the regulated system measure is designed for::Upstream of hydropower plant]]
 +
|-
 +
||[[Section in the regulated system measure is designed for::Bypass section]]
 +
|-
 +
||[[Section in the regulated system measure is designed for::Downstream outlet]]
 +
|-
 +
|rowspan = "3"|River type implemented||[[River type implemented::Steep gradient (up to 0.4 %)]]
 +
|-
 +
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]
 +
|-
 +
||-
 +
|-
 +
||Level of certainty in effect||[[Level of certainty in effect::Very certain]]
 +
|-
 +
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]]
 +
|-
 +
||Cost of solution||See [[Costs of solutions|cost table]]
 +
|}

Latest revision as of 13:48, 9 October 2020

Classification Selection
Fish species for the measure All
Does the measure require loss of power production -
-
Structural (requires no additional flow release)
Recurrence of maintenance Irregular at events
Which life-stage of fish is measure aimed at Spawning / Recruitment
Juveniles
Adult fish
Movements of migration of fish
Which physical parameter is addressed -
-
-
Substrate and hyporheic zone
-
-
Water velocity
-
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for -
Upstream of hydropower plant
Bypass section
Downstream outlet
River type implemented Steep gradient (up to 0.4 %)
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
-
Level of certainty in effect Very certain
Technology readiness level TRL 9: actual system proven in operational environment
Cost of solution See cost table