Difference between revisions of "Template:Migration barrier removal"
Jump to navigation
Jump to search
(Making templates for classification tables) |
(Updating classification tables: minor changes) |
||
(9 intermediate revisions by the same user not shown) | |||
Line 12: | Line 12: | ||
||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]] | ||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]] | ||
|- | |- | ||
− | |rowspan = " | + | |rowspan = "4"|Which life-stage of fish is measure aimed at||- |
− | |||
− | |||
− | |||
− | ||- | ||
|- | |- | ||
||- | ||- | ||
Line 24: | Line 20: | ||
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]] | ||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]] | ||
|- | |- | ||
− | |rowspan = "8"|Which physical parameter is | + | |rowspan="8"|Which physical parameter is addressed||[[Which physical parameter is addressed::N/A]] |
|- | |- | ||
||- | ||- | ||
Line 40: | Line 36: | ||
||- | ||- | ||
|- | |- | ||
− | |rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]] | + | |rowspan="2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]] |
|- | |- | ||
||[[Hydropower type the measure is suitable for::Plant with bypass section]] | ||[[Hydropower type the measure is suitable for::Plant with bypass section]] | ||
|- | |- | ||
− | ||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::Up to 20]] | + | |rowspan = "1"|Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::Up to 20]] |
|- | |- | ||
− | |rowspan = "4"|Section in the regulated system measure is designed for||[[Section in the regulated system measure is designed for::In dam/power plant]] | + | |rowspan="4"|Section in the regulated system measure is designed for||[[Section in the regulated system measure is designed for::In dam/power plant]] |
|- | |- | ||
||- | ||- | ||
Line 63: | Line 59: | ||
|- | |- | ||
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]] | ||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]] | ||
+ | |- | ||
+ | ||Cost of solution||See [[Costs of solutions|cost table]] | ||
|} | |} |
Latest revision as of 13:48, 9 October 2020
Classification | Selection |
---|---|
Fish species for the measure | All |
Does the measure require loss of power production | Operational (requires flow release outside turbine) |
- | |
- | |
Recurrence of maintenance | Irregular at events |
Which life-stage of fish is measure aimed at | - |
- | |
- | |
Movements of migration of fish | |
Which physical parameter is addressed | N/A |
- | |
- | |
- | |
- | |
- | |
- | |
- | |
Hydropower type the measure is suitable for | Plant in dam |
Plant with bypass section | |
Dam height (m) the measure is suitable for | Up to 20 |
Section in the regulated system measure is designed for | In dam/power plant |
- | |
- | |
- | |
River type implemented | Steep gradient (up to 0.4 %) |
Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
Slow flowing, lowland, sandy (less than 0.05 %) | |
Level of certainty in effect | Moderately certain |
Technology readiness level | TRL 9: actual system proven in operational environment |
Cost of solution | See cost table |