Difference between revisions of "Template:Construction of a 'river-in-the-river'"

From FIThydrowiki
Jump to navigation Jump to search
(Updating classification tables: changing available parameters)
(Updating classification tables: minor changes)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
! Classification !! Selection
 
! Classification !! Selection
 
|-
 
|-
|Fish species for the measure||[[Fish species for the measure::Gravel spawners]]
+
|Fish species for the measure||[[Fish species for the measure::All]]
 
|-
 
|-
 
|rowspan = "3"|Does the measure require loss of power production||-
 
|rowspan = "3"|Does the measure require loss of power production||-
Line 18: Line 18:
 
||[[Which life-stage of fish is measure aimed at::Adult fish]]
 
||[[Which life-stage of fish is measure aimed at::Adult fish]]
 
|-
 
|-
||[[Which life-stage of fish is measure aimed at::Movements and migration of fish]]
+
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]]
 
|-
 
|-
|rowspan = "9"|Which physical parameter is addressed||-
+
|rowspan="8"|Which physical parameter is addressed||-
 
|-
 
|-
 
||-
 
||-
Line 36: Line 36:
 
||[[Which physical parameter is addressed::Water depth]]
 
||[[Which physical parameter is addressed::Water depth]]
 
|-
 
|-
|rowspan = "2"|||[[Hydropower type the measure is suitable for::Plant in dam]]
+
|rowspan="2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
 
|-
 
|-
 
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
 
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
 
|-
 
|-
||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]]
+
|rowspan = "1"|Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]]
 
|-
 
|-
|rowspan = "4"|Section in the regulated system measure is designed for||-
+
|rowspan="4"|Section in the regulated system measure is designed for||-
 
|-
 
|-
 
||-
 
||-
Line 59: Line 59:
 
|-
 
|-
 
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]]
 
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]]
 +
|-
 +
||Cost of solution||See [[Costs of solutions|cost table]]
 
|}
 
|}

Latest revision as of 13:48, 9 October 2020

Classification Selection
Fish species for the measure All
Does the measure require loss of power production -
-
Structural (requires no additional flow release)
Recurrence of maintenance Less often than yearly
Which life-stage of fish is measure aimed at Spawning / Recruitment
Juveniles
Adult fish
Movements of migration of fish
Which physical parameter is addressed -
-
-
Substrate and hyporheic zone
-
-
Water velocity
Water depth
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for -
-
Bypass section
-
River type implemented Steep gradient (up to 0.4 %)
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
Slow flowing, lowland, sandy (less than 0.05 %)
Level of certainty in effect Moderately certain
Technology readiness level TRL 9: actual system proven in operational environment
Cost of solution See cost table