Difference between revisions of "Template:Placement of spawning gravel in the river"
Jump to navigation
Jump to search
(Updating classification tables: minor changes) |
(Updating classification tables: minor changes) |
||
Line 2: | Line 2: | ||
! Classification !! Selection | ! Classification !! Selection | ||
|- | |- | ||
− | |Fish species for the measure||[[Fish species for the measure:: | + | |Fish species for the measure||[[Fish species for the measure::Gravel spawners]] |
|- | |- | ||
|rowspan = "3"|Does the measure require loss of power production||- | |rowspan = "3"|Does the measure require loss of power production||- | ||
Line 62: | Line 62: | ||
||Level of certainty in effect||[[Level of certainty in effect::Very certain]] | ||Level of certainty in effect||[[Level of certainty in effect::Very certain]] | ||
|- | |- | ||
− | ||Technology readiness level||[[Technology readiness level::TRL | + | ||Technology readiness level||[[Technology readiness level::TRL 8: system complete and qualified]] |
+ | |- | ||
+ | ||Cost of solution||See [[Costs of solutions|cost table]] | ||
|} | |} |
Revision as of 12:53, 30 September 2020
Classification | Selection |
---|---|
Fish species for the measure | Gravel spawners |
Does the measure require loss of power production | - |
- | |
Structural (requires no additional flow release) | |
Recurrence of maintenance | Less often than yearly |
Which life-stage of fish is measure aimed at | Spawning / Recruitment |
- | |
- | |
- | |
- | |
- | |
Which physical parameter is addressed | - |
- | |
- | |
Substrate and hyporheic zone | |
- | |
- | |
- | |
- | |
Hydropower type the measure is suitable for | Plant in dam |
Plant with bypass section | |
Dam height (m) the measure is suitable for | All |
Section in the regulated system measure is designed for | - |
Upstream of hydropower plant | |
Bypass section | |
Downstream outlet | |
River type implemented | Bypass section |
Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
- | |
Level of certainty in effect | Very certain |
Technology readiness level | TRL 8: system complete and qualified |
Cost of solution | See cost table |