Line 2: Line 2:
 
! Classification !! Selection
 
! Classification !! Selection
 
|-
 
|-
|Fish species for the measure||[[Fish species for the measure::All]]
+
|Fish species for the measure||[[Fish species for the measure::Eel and Lamprey]]
 
|-
 
|-
 
|rowspan = "3"|Does the measure require loss of power production||[[Does the measure require loss of power production::Operational (requires flow release outside turbine)]]
 
|rowspan = "3"|Does the measure require loss of power production||[[Does the measure require loss of power production::Operational (requires flow release outside turbine)]]
Line 62: Line 62:
 
||Level of certainty in effect||[[Level of certainty in effect::Moderately certain]]
 
||Level of certainty in effect||[[Level of certainty in effect::Moderately certain]]
 
|-
 
|-
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]]
+
||Technology readiness level||[[Technology readiness level::TRL 8: system complete and qualified]]
 +
|-
 +
||Cost of solution||See [[Costs of solutions|cost table]]
 
|}
 
|}

Revision as of 12:53, 30 September 2020

Classification Selection
Fish species for the measure Eel and Lamprey
Does the measure require loss of power production Operational (requires flow release outside turbine)
-
-
Recurrence of maintenance Irregular at events
Which life-stage of fish is measure aimed at -
-
-
-
-
Movements of migration of fish
Which physical parameter is addressed N/A
-
-
-
-
-
-
-
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for Up to 20
Section in the regulated system measure is designed for In dam/power plant
-
-
-
River type implemented -
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
Slow flowing, lowland, sandy (less than 0.05 %)
Level of certainty in effect Moderately certain
Technology readiness level TRL 8: system complete and qualified
Cost of solution See cost table