Difference between revisions of "Template:Bypass combined with other solutions"
Jump to navigation
Jump to search
(Updating classification tables: minor changes) |
(Updating classification tables: minor changes) |
||
Line 1: | Line 1: | ||
{| class="wikitable" | {| class="wikitable" | ||
− | |||
− | |||
! Classification !! Selection | ! Classification !! Selection | ||
|- | |- | ||
Line 14: | Line 12: | ||
||Recurrence of maintenance||[[Recurrence of maintenance::Weekly]] | ||Recurrence of maintenance||[[Recurrence of maintenance::Weekly]] | ||
|- | |- | ||
− | |rowspan = " | + | |rowspan = "6"|Which life-stage of fish is measure aimed at||- |
+ | |- | ||
+ | ||- | ||
+ | |- | ||
+ | ||- | ||
|- | |- | ||
||- | ||- | ||
Line 20: | Line 22: | ||
||- | ||- | ||
|- | |- | ||
− | ||[[Which life-stage of fish is measure aimed at::Movements | + | ||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]] |
|- | |- | ||
− | |rowspan = "8"|Which physical parameter is addressed||[[Which physical parameter is addressed:: | + | |rowspan = "8"|Which physical parameter is addressed||[[Which physical parameter is addressed::N/A]] |
|- | |- | ||
||- | ||- | ||
Line 52: | Line 54: | ||
||- | ||- | ||
|- | |- | ||
− | |rowspan = "3"|River type implemented|| | + | |rowspan = "3"|River type implemented||- |
|- | |- | ||
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]] | ||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]] | ||
Line 60: | Line 62: | ||
||Level of certainty in effect||[[Level of certainty in effect::Moderately certain]] | ||Level of certainty in effect||[[Level of certainty in effect::Moderately certain]] | ||
|- | |- | ||
− | ||Technology readiness level||[[Technology readiness level::TRL | + | ||Technology readiness level||[[Technology readiness level::TRL 8: system complete and qualified]] |
+ | |- | ||
+ | ||Cost of solution||See [[Costs of solutions|cost table]] | ||
|} | |} |
Revision as of 12:53, 30 September 2020
Classification | Selection |
---|---|
Fish species for the measure | All |
Does the measure require loss of power production | Operational (requires flow release outside turbine) |
- | |
- | |
Recurrence of maintenance | Weekly |
Which life-stage of fish is measure aimed at | - |
- | |
- | |
- | |
- | |
Movements of migration of fish | |
Which physical parameter is addressed | N/A |
- | |
- | |
- | |
- | |
- | |
- | |
- | |
Hydropower type the measure is suitable for | Plant in dam |
Plant with bypass section | |
Dam height (m) the measure is suitable for | All |
Section in the regulated system measure is designed for | In dam/power plant |
- | |
- | |
- | |
River type implemented | - |
Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
Slow flowing, lowland, sandy (less than 0.05 %) | |
Level of certainty in effect | Moderately certain |
Technology readiness level | TRL 8: system complete and qualified |
Cost of solution | See cost table |